12 m All-in-One Solar Street Light

Assess whether a 12 m integrated solar street light can serve the proposed road positions. Compare optics, installed aiming, charging and access before selecting a configuration.

SL-AIO-HC integrated solar street light system and component views
SL-AIO-HC head, optic and photovoltaic surface.

Approve road lighting and energy in the same proposal

Ask for the IES file and the lowest-month energy calculation for the same proposed light and dimming schedule. Use the results to compare the integrated and split routes.

SL-AIO-HC integrated solar street light system and component views
Series view

SL-AIO-HC · 120 W

Integrated solar panel and battery

Evaluate the 120 W head on the lighting grid first. Verify the selected optic, winter energy balance and the load on the pole with the proposed equipment.

Put the integrated and split options on one project brief

Send first

Share the road criteria, pole positions, available sunlight on the installed panel, access equipment and night settings. Identify which civil details are fixed and which your designer can still change.

What to check

Compare the exact HC 120 W integrated option with a split layout under the same road and night requirements. Check the quality of light, lowest-month recharge and equipment retrieval at the head.

Decide if the 12 m road can stay all-in-one

At 12 m, compare the integrated 120 W HC as an assembly on the actual road. Ask for a road calculation and a worst-month energy review for the same lens, mounting angle and hourly schedule. Then check how the local team will reach and replace the integrated equipment at that height.

Question that decides the architectureEvidence to request
Does the head meet the road criteria?The specific IES and road model for the specified road width, spacing and aim.
Can the installed panel meet the energy plan?A seasonal check at the panel’s installed orientation using actual dimming and permissible battery reserve.
Is service at the head practical?Access method, maintenance procedure and the parts available for the approved configuration.

If panel placement or service access limits the integrated option, use the linked 12 m split page to compare the same lighting brief with a separate panel and enclosure. Keep the optical inputs consistent so the team can see which layout improves charging or servicing.

Compare a 12 m integrated head with the separate-panel option

  • Check the road first. Use the selected lens, tilt and actual pole spacing to compare the average, minimum and uniformity against the same road criteria. Review the DIALux inputs
  • Check charging and structure. Confirm the usable battery, least-sunny-month recharge and exposed area of the selected assembly. If the integrated seating or panel position cannot meet the solar requirement, compare a separately aimed panel. Compare the 12 m split option

Establish whether a single integrated head can serve the proposed positions

A 12 m solar street light project needs a decision about the road before it needs a commitment to a particular head. Identify the carriageway, pedestrian areas, crossings and any outer lanes the installation must serve. Give the designer the light centre height, pole spacing and offset, bracket, aiming limitations and the operating conditions that the owner will accept. Ask how a proposed integrated head would serve the critical parts of the route. At this stage, the project gets more value from identifying the conditions for a workable solution than from attaching a larger nominal wattage to the same layout.

Tell the supplier which parts of the design are fixed. Some jobs already have foundations; others use a spacing drawn up for a different kind of luminaire. The required levels and hours can be fixed while the positions and optics are still open. Record each item so the designer knows which adjustments are practical. If older reports are being carried into the next phase, ask where they place the light source above finished ground and how they define the route and its assessment areas. Use the actual pole and road drawing for the proposed 12 m arrangement.

Check the optical result before trying to size the battery

Ask for a calculation using the exact proposal’s photometry, beam and applicable output. Review the pattern along and across the road, including the places the owner identified as critical. A taller or more powerful fixture can produce a bright centre and still leave weak areas near the edge or between positions. Have the reviewer show the required visibility measures for the road and operating mode rather than judging the offer by the highest or average reading alone. If requirements conflict or do not name a measurement method, have the project team agree what will be accepted.

Compare the effect of the practical changes. A different distribution can move light towards a difficult lane. The required level can sometimes be reached with adjusted spacing or position rather than with a larger load at every pole. Where the project uses distinct areas, giving each area the appropriate layout may work better than asking one arrangement to serve them all. Record those options so the buyer can review associated civil and access work at the same time. Use the operating level shown by the lighting check as the load for the energy review.

Sunlurio goniophotometer photometric testing lab for street lighting IES and LDT review
Photometry equipment used to prepare luminaire distribution files.

Confirm the photovoltaic surface can work at the required aim

On an integrated assembly the solar surface moves with the body within the permitted adjustment. Show the installed bearing and angle of the proposed head from the lighting layout. Confirm the resulting panel direction against the actual site’s horizon and seasonal obstacles. If a useful optical change demands a position that reduces available charging, ask for a comparison at the orientations that each option can actually maintain. Lighting and energy reports should refer to the same installed assembly. Review how the alternative works in the least favourable expected operating period.

List the operating hours at each level, the relevant battery conditions and the agreed service through a charging deficit. Ask what can be changed after weak solar days and which lighting periods the owner cannot give up. Compare usable storage with charging and recovery against the exact electrical load and approved modes. One configuration can have enough short-term reserve and still need an impractical amount of time to recover. Use the figures associated with the proposed equipment to identify which part of the energy case needs improvement before you select the system.

SL-ONE-AF luminaire front and solar panel rear views
SL-ONE-AF optic and photovoltaic surfaces.

Review both architectures before committing to the pole

Send one road and night brief for the integrated and split options. Compare the matched road results, seasonal recharge, equipment position and head access. Use the selected assembly to settle the pole and installation design.

Match the electrical and civil details to the chosen head. When the integrated layout is selected, send the exact head and mount to the pole reviewer with the foundation information. Have the electrical reviewer identify the applicable isolation and earthing details for this site. If the design moves to split equipment, review the added connections and parts on the pole before issuing the new work package.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Decide when to move away from the initial layout

Keep an integrated candidate in the comparison once the road result, charging and actual mount can be supported together. If uneven coverage is the main problem, compare the relevant optics and site changes. If the only workable optical aim places the panel in poor sun, see what an independently positioned panel would change. If the road and energy inputs can be met but the geometry or access introduces a problem, compare how the bracket, pole position or component placement affects the installation. Name the constraint in each option, so the review answers what actually prevented acceptance.

In earlier project reviews, a customer could be interested in a tighter spacing and different height while the required geometry and outputs still needed clarification. Treat interest in an option as the basis for a comparison. Take the chosen positions back through the lighting, charging and installed assembly checks before the team signs off. If the final choice has not been made, identify the decision the owner can take now, such as reserving a position or keeping options open in a tender. Explain what evidence must be supplied before ordering or manufacturing a repeated configuration.

Verify structure and access for the actual assembly

Give the reviewer the geometry, weight, mounting and installed angle of the intended head, including any adapter. Include the arm, pole, attachments, foundation information and relevant site conditions. A head suggested on the basis of light output and energy still needs to suit the structure and the connection. Ask for the limits of the assessment and the approved conditions before installing the equipment. If the owner is considering reuse, the pole condition and actual construction need to be reviewed against the proposed loads.

Show how the installation and maintenance teams can reach the head. Include route access and working clearance at representative positions, including the places where a road remains operational. Ask what has to be removed to reach common service parts and where the crew can carry out the work. If those constraints make a configuration hard to maintain, document what a different arrangement changes. The same technical decision can have very different effects at a roadway with ample access and at a constrained site with only short maintenance windows.

A batch of long lighting pole shafts stacked in the workshop
Pole shafts staged in the workshop.

Check the complete integrated head before batch release

Review the production unit against the approved lens, panel, battery, mounting and controls. Confirm the team can identify and service the ordered configuration at the mounting height agreed for the project.

LED street light final assembly line with luminaires prepared for project orders
Luminaire assembly and finished-product preparation.

Give the buyer a clear route to acceptance

Prepare a comparison tied to specific equipment references. Ask the project team for the exact photometry and lighting report, the schedule used for the energy assessment, the system and mounting drawings, and the relevant installation and service records. Identify which documents are for design review and which are approved for construction and commissioning. Review the differences between the required and proposed arrangement, including conditions still to prove. This makes it possible to set an approval point before a purchase order becomes dependent on a configuration that has not been cleared.

If the owner is preparing a tender, keep a decision column for what remains fixed and what a bidder may propose. A height and operating schedule can be fixed while different road optics or pole positions are offered as alternatives. Ask bidders to show the consequences of each allowed change with consistent comparison criteria and supporting information. When the project advances, confirm the selected option and close any earlier alternates on the drawings. Keep the accepted drawing version with that release. This prevents a supply choice from borrowing the optical claim or energy assumptions of a different proposal.

Choose the first installation to verify the most significant practical conditions. Record aim, controller settings and the field layout, and use the agreed road measurement method at the applicable modes. Preserve the relevant charging and structure evidence separately for the review. If the proposal changes as a result, trace the change through equipment, installation documents and the basis of the earlier results. Match the final supplied parts and settings to the records that were accepted. Keep model and optic references with spares to avoid changing the installation’s behaviour through an apparently simple repair.

Choose the architecture before you commit to the pole design

Set a lighting test both options must pass

Use each model’s matching IES at the specified aim. Compare the road results on the same cross-section and spacing.

Compare operating and service conditions

Check the expected winter or rainy-season recovery and how the team reaches the battery or controller. Price any different brackets, access or service scope on matching terms.

Move to a split review when the site needs it

If exposure or service access puts the integrated option at risk, use the same brief to check a separately aimed panel and serviceable enclosure. Approve the resulting equipment and pole layout together.

Require a single proposal that explains the road and the energy plan

For a 12 m proposal, ask for the lighting result, the nightly power schedule and the energy balance on one revision. A package can meet the initial calculation and still have too little solar input for its program. When reviewing alternatives, keep the required road lighting level visible and ask which constraint each change solves: optics, spacing, panel recovery or usable battery energy.

Put the mounting parts and service spares on distinct lines

Tie the heads, brackets and agreed spares to the locations on the packing list. Ask for packed dimensions and the delivery and lifting requirements for the exact ordered configuration before arranging site transport.

Keep the approved layout tied to the final order. Once the integrated layout passes review, ask us for a dispatch window against the exact assembly and written coverage by component. Record the start date and the arrangements for replacement and site access. If the purchase switches to split equipment, ask for the revised delivery and coverage terms before issuing the order.

Carton pallet packing reference with protective wrapping for project lighting shipment
Wrapped cartons prepared on a pallet.

Questions before choosing an integrated system at 12 m

Compare the proposed head with the road geometry, required performance and operating conditions first. Keep the exact optic, load and mounting details visible in the discussion. If the site requirements need adjustment, make the alternatives clear before committing to a head, pole or battery that restricts the usable options.

Ask the lighting designer to show what changes on the full road at that spacing. Check the weakest areas, glare and the intended mode. Revisit the energy and mounting review if the approved configuration changes. If the spacing remains unsuitable for the requirements, compare available layout changes while the programme can still accommodate them.

Use separate solar and lighting inputs where the conditions differ. A shared family and spare strategy may still be possible if the assessed configuration serves both. Confirm which variants go where, especially for positions with different aims or charging conditions. Give the installer position references for the final assignments.

Include a split option when the road light position and panel position need to be chosen independently, or when equipment access is a major concern. Compare the extra support and wiring with the layout and energy benefit. Ask for a project-specific review of the same service criteria for both structures.

Send the current pole plan and cross-section, required operating conditions, site details and any fixed civil dimensions. Identify where the designer can adjust spacing, mounting or optics. Those inputs allow an initial feasibility comparison while the owner confirms the approvals that matter for the final installation.

List the open inputs and which decision each one affects. A drawing review can continue for confirmed geometry while a lighting or energy result remains provisional. Ask the buyer to confirm the point at which the final site inputs and equipment evidence are required before the order is released.

Agree the required output by time period. If the site requires full output for the whole night, use that load in the energy review and confirm usable battery energy, expected solar recovery and the reserve.

Submit the offered model and optic, the matching photometry and road calculation, the power and reserve assumptions, and the mounting drawing. List conditional items or deviations separately so they can be reviewed.

Review a split option where the integrated panel cannot get the required exposure, its expected recovery is inadequate, or the service method is impractical. Check the revised structural assembly and cable route with that option.

Assess My 12 m Layout

Send the pole and road plans, lighting criteria, operating modes, site conditions and which civil dimensions the project has fixed.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.