For project quotation, certificates should be matched with the exact product model, battery configuration, project country and tender requirement. CE, RoHS, ISO, SDS and UN38.3 documents may support different review stages, but they should not be used as a replacement for product datasheets, IES files, DIALux layout, BOQ matching notes or shipment documents.
Request available CE, RoHS, ISO or factory audit references for the selected product model and project stage.
For lithium battery projects, confirm SDS, UN38.3 test summary and packaging information before shipment planning.
Send tender clauses, BOQ items or consultant comments for document matching and technical clarification support.
Match datasheets, IES/LDT files, DIALux support, drawings and foundation references with the actual project inputs.
Country, city, road type, public area, port, parking lot or off-grid site condition.
Solar street light, LED street light, battery capacity, controller, pole height and mounting method.
BOQ item, tender clause, consultant comment, drawing or required compliance document list.
SDS, UN38.3 test summary, packaging and lithium battery transport requirements where applicable.
Datasheets, IES/LDT files, DIALux support, drawings, wiring references and BOQ notes can be prepared according to confirmed project inputs.
Factory process, inspection workflow, packaging method and batch delivery planning can be checked before procurement or shipment.
Certificates and test reports should be matched to exact model, battery configuration, supplier scope and tender requirement before submission.
Certificate and test report availability may vary by product model, component supplier, battery configuration, project country and tender stage. Please send the BOQ, product path or required document list before final submission.
Match CE, RoHS, ISO, SDS, UN38.3 and test report references with the selected model, component scope and tender requirement.
Prepare document lists, BOQ matching notes, datasheets and technical clarification points for consultant or client review.
Confirm SDS, UN38.3 test summary, packing information and battery configuration before shipment planning and export booking.
Use IES/LDT files, DIALux support, drawings and project inputs to reduce review loops before procurement or installation.
Project references are used to explain our engineering and document support workflow. Final certificates, test reports, drawings, IES/LDT files, DIALux support and shipment documents depend on confirmed product model, project requirements and submission stage.
Sunlurio project lighting team usually replies within 24 working hours..
WhatsApp us
Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.