Solar Street Lighting Project Support for EPC, Municipal & Tender Requirements
✓ DIALux and IES support for roadway lighting requirements
✓ Battery, PV and dimming review for local operating conditions
✓ BOQ, datasheet and tender documentation support
Start Your Solar Street Lighting Project Review
Complete the short form. Our team will confirm the required project inputs and the appropriate next review step.
PROJECT REVIEW PATHS
Choose the Right Review Path Before Requesting a Quotation
Select the path that matches your current solar street lighting project stage, then submit the required project inputs, BOQ, road data, or tender documents for review.
Quotation Configuration Review
For early-stage solar street lighting quotation and product direction.
Prepare: country, quantity, road or site data, pole height, working hours.
BOQ & Tender Document Review
For solar street lighting tender, EPC, consultant, and formal technical submissions.
Prepare: BOQ, specification, drawings, certificates, deadline.
IES / DIALux / Road Lighting Review
For roadway lighting layout, photometric review, or IES / LDT support requests.
Prepare: road width, pole height, spacing, target lux, layout drawing.
Solar Autonomy, Battery & Dimming Review
For solar backup days, dimming profile, battery sizing, and local operating condition review.
Prepare: working hours, dimming schedule, backup days, weather condition, autonomy target.
This review does not replace final engineering design. Final product selection, lighting layout, solar configuration, BOQ matching, and document release depend on confirmed project inputs.
SOLAR PROJECT EVIDENCE
Solar Street Lighting References for Similar Project Requirements
Review selected solar street lighting references before submitting your BOQ, road data or tender documents. Detailed files are released according to project scope and disclosure limits.
Solar Street Lighting Project in Togo
Solar Street Lighting Project in Ghana
Split Solar Street Lighting Project in Côte d’Ivoire
Solar Street Lighting Project in Burkina Faso
Public summaries only. IES / LDT files, DIALux review, BOQ notes, and detailed project documents are released after project scope review and remain subject to disclosure limits.
PROJECT INPUT CHECKLIST
Send These Project Inputs First
Send the project information you already have. Sunlurio will identify any missing inputs before system configuration, quotation or tender-document preparation.
Basic Inputs
- Country / project location
- Project stage
- Product type
- Estimated quantity
- Client type
- Tender or quotation deadline
Technical Inputs
- Road width or site area
- Pole height and spacing
- Working hours
- Dimming schedule
- Backup days / autonomy target
- Battery or solar panel requirement
Files and Requirements You Can Share
- BOQ
- Tender specification
- Road layout
- CAD drawing
- IES / LDT request
- DIALux / Relux requirement
- Foundation or pole drawing
- Certificate requirement
AFTER SUBMISSION
What Happens After You Submit
After receiving your solar street lighting project inputs, Sunlurio reviews the scope, checks the available technical information, and confirms the next step before quotation or tender-document support begins.
Review Project Scope
We check the project type, location, quantity, application, customer role, and current quotation or tender stage.
Check Solar Configuration and Documents
The team reviews BOQ, road data, dimming schedule, autonomy target, battery backup days, IES / DIALux inputs, and available drawings or tender documents.
Confirm the Next Review Step
You receive a missing-input list, recommended quotation path, and required document support scope for the next stage.
Final quotation, lighting layout, solar product selection, and formal document release depend on confirmed project inputs, tender requirements, and agreed support scope.