4G/5G Smart Lighting Project References

References for smart-control deployments with real dashboards, remote monitoring, and field-proven dimming strategies—built for EPC and municipal projects.

What Each Reference Includes

A consistent proof structure to support tender reviews and internal approvals.

Featured Case Studies

A small selection of deployments. More references can be shared based on your country and scope.

Ethiopia Smart Lighting Project (2024)

Ethiopia | 300 sets | Road corridors | 4G remote monitoring

Lebanon Main Road Smart Lighting Deployment

Lebanon | 500 sets | Main road | 7 m poles | 80 W

Nigeria Rural Road Smart Lighting Deployment

Nigeria | 120 sets | Rural roads | 6 m poles | 80 W

Senegal Road Smart Lighting Deployment

Senegal | 211 sets | Road lighting | 8 m poles | 75 W
More references are available by region and product category—share your country and scope.

Typical Smart-Control Configuration Snapshot

Each reference summarizes typical smart-control setup (platform scope, SIM strategy, control logic, and reporting fields) without exposing client-specific parameters.
If you share your use case and tender checklist, we can provide a tailored control outline and deliverables list—redacted or under NDA when required.
Typical Inputs
  • Platform scope (single site / multi-site)
  • SIM strategy (local SIM / roaming / eSIM)
  • Control mode (time-based / dimming profile / sensor)
  • Required dashboards & reports
What We Verify
  • Control logic & schedules
  • Alarm rules & fault reporting
  • Data fields (battery, PV, load, runtime)
  • Device ID, QC traceability & commissioning notes

Typical Smart-Control Deliverables (On Request)

Share your platform scope, SIM strategy, and required dashboards—we’ll reply with the most relevant pack options (redacted or under NDA if required).

Request a Similar Proposal (24H)

Share your country, quantity, road type, and submission checklist.
We’ll reply within 24 hours with a recommended configuration range and a document list (redacted or under NDA if required).  

What you’ll get in 24 hours
🧩
Configuration snapshot (typical assumptions)
📈
IES / DIALux availability list (by model)
🧾
BOQ mapping notes for procurement
QC / delivery evidence on request

Request Your Custom Quote – No Middlemen