SUNLURIO PROJECT TEAM

Meet the Team Behind Sunlurio Lighting Projects

Our commercial, engineering, quality and project coordination functions work around one confirmed project scope—from requirement review and configuration alignment to documents, inspection and delivery support.

FIRST REVIEW

What We Align Before a Project Moves Forward

01

Buyer type and project stage

02

Site, performance and operating inputs

03

Required files and approval path

04

Quotation, inspection and delivery scope
Boundary: Project-specific configuration starts after the key inputs are confirmed.

TEAM COVERAGE

One Project, Four Coordinated Responsibilities

Project buyers should know how requirements, engineering inputs, documents and delivery are coordinated. Sunlurio organizes these functions around one confirmed project scope.

01

Project & Commercial Coordination

Buyer type, project stage, project scope, quotation basis and the next action are clarified before the request moves forward.
Typical output:
Clarification list and commercial response path

02

Engineering Review

Road width, pole height, spacing, operating hours, autonomy, climate, wind, control and installation conditions are reviewed before configuration.
Typical output:
Configuration basis and technical questions

03

Documents & Tender Support

Datasheets, IES files, DIALux inputs, drawings, BOQ matching and compliance documents are coordinated according to the confirmed project stage.
Typical output:
Applicable document list and submission path

04

Quality & Delivery Coordination

Approved specifications, inspection points, labels, packing, shipping documents and handover needs are tracked against the confirmed order scope.
Typical output:
Inspection and delivery coordination record
Project-specific files are released after the product configuration and required inputs are confirmed. Availability varies by product, project stage and approval scope.

PEOPLE BEHIND THE WORKMeet the Sunlurio Project Team

Sunlurio’s project team combines commercial coordination, lighting engineering, quality management, tender documentation and international project support. Founder and CEO Stephen Zhang brings 20 years of street lighting experience, while Senior Lighting Engineer Sony Cao has worked in the sector for more than 20 years. The company’s functional managers typically bring 5–10 years of experience in their respective fields.

Stephen Zhang, Founder and CEO at Sunlurio

Stephen Zhang

20 YEARS IN STREET LIGHTING
Founder & CEO

Stephen Zhang founded Qingdao Hitech New Energy Co., Ltd. and leads the Sunlurio brand. With 20 years in the street lighting industry, he works across solar street lighting, LED road lighting, smart lighting, high-mast systems, lighting poles, photovoltaic applications and energy storage.

He reviews the technical and commercial direction of major EPC, municipal, government and tender-based lighting projects. His role is to keep product configuration, engineering support, manufacturing coordination and delivery planning aligned with the customer’s actual project requirements.

PROJECT CONTRIBUTION
  • System and project strategy
  • Technical-commercial review
  • Major project risk decisions

Mary Zhang, Quality Manager at Sunlurio

Mary Zhang

Mary Zhang leads product quality coordination across Sunlurio’s solar and outdoor lighting projects. Her review covers incoming materials, production checks, finished-product testing, batch consistency, packing and pre-shipment inspection for luminaires, solar panels, LiFePO4 batteries, controllers, lighting poles and project accessories.

PROJECT CONTRIBUTION
  • Inspection checkpoints
  • Batch consistency records
  • Pre-shipment verification

Mia Xu, Project Manager at Sunlurio

Mia Xu

Mia Xu coordinates customer inputs, BOQ requirements, drawings, document lists, production milestones, inspection and delivery. She keeps commercial commitments, engineering information and manufacturing progress connected from initial project review through shipment and handover.

PROJECT CONTRIBUTION
  • Input and action list
  • Production and delivery milestones
  • Project handover coordination

Tom Xu, Lighting Design Engineer at Sunlurio

Tom Xu

Tom Xu specializes in photometric analysis, IES and LDT interpretation, DIALux calculation support, optical distribution, pole spacing, mounting height, illuminance and uniformity review. He translates road geometry and lighting targets into practical luminaire and layout recommendations.

PROJECT CONTRIBUTION
  • DIALux and photometric review
  • Optics and spacing recommendation
  • Technical design assumptions

Cindy Wang, Engineering Project Manager at Sunlurio

Cindy Wang

Engineering Project Manager

Cindy Wang leads engineering coordination and tender-document work for complex lighting opportunities. She has supported tender preparation and technical submissions for major government and UN-related project opportunities, coordinating BOQ review, compliance information, drawings, datasheets and technical deviation notes.

PROJECT CONTRIBUTION
  • BOQ and compliance review
  • Technical submittal planning
  • Cross-functional engineering coordination

Sunny Li, Business Manager at Sunlurio

Sunny Li

Business Manager

Sunny Li manages commercial communication for EPC contractors, government-project partners, consultants, agents and distributors. She clarifies the buyer type, project stage, quotation basis and required next action before project information moves into engineering review and formal pricing.

PROJECT CONTRIBUTION
  • Commercial clarification
  • Quotation coordination
  • Buyer follow-up and internal handover

Lisa Hu, Sales Manager at Sunlurio

Lisa Hu

Sales Manager

Lisa Hu leads Sunlurio’s international sales team and supports the qualification and follow-up of project-based lighting opportunities. She helps ensure that application, country, quantities, technical requirements, BOQ, drawings and decision timeline are clarified before engineering review or formal quotation.

PROJECT CONTRIBUTION
  • Opportunity qualification
  • Sales process management
  • Customer and internal alignment

Sony Cao, Senior Lighting Engineer at Sunlurio

Sony Cao

20+ YEARS IN STREET LIGHTING
Senior Lighting Engineer

Sony Cao has more than 20 years of experience in the street lighting industry. His practical expertise covers LED road lighting, solar street lighting, lighting poles, high-mast systems, luminaire configuration and real project-site conditions.

He has travelled internationally to support project discussions, technical reviews and delivery coordination. His field-oriented experience helps the team identify risks involving installation, structure, product configuration, site conditions, maintenance access and long-term operation before production or delivery.

PROJECT CONTRIBUTION
  • Senior technical review
  • Site and installation risk review
  • Product and structural practicality

PROJECT HANDOFF

How Responsibility Moves Through a Lighting Project

This sequence helps keep commercial commitments, technical inputs, project files and delivery records aligned.

01

Qualify the Request

Action: Confirm the buyer type, country, application, project stage, quantities, available BOQ or drawings and the expected decision timeline.
Functions: Project / Commercial
Typical output: Missing-input list and review path

02

Review Technical Inputs

Action: Review road geometry, pole height, spacing, lighting target, operating hours, autonomy, climate, wind, control and installation conditions.
Functions: Engineering / Project
Typical output: Configuration basis and clarification questions

03

Coordinate the Proposal Pack

Action: Align the quotation scope with applicable datasheets, IES files, DIALux work, drawings, BOQ matching and compliance references.
Functions: Commercial / Engineering / Documents
Typical output: Coordinated proposal and document list

04

Lock the Approved Scope and Quality Points

Action: Keep the approved configuration, materials, inspection points, labels and packing requirements aligned before dispatch.
Functions: Project / Quality / Production Coordination
Typical output: Approved scope and inspection record

05

Support Delivery and Handover

Action: Coordinate shipping documents, installation references, O&M information, spare-parts needs and warranty communication according to the confirmed order scope.
Functions: Project / Delivery
Typical output: Delivery and handover support pack
The exact process and document set depend on the confirmed product, order scope and project stage. Engineering files cannot be finalized until the required project inputs are available.

Request a Project Document Pack

Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.