Tender Documents & BOQ Support for Lighting Projects

Share your BOQ, tender specification, lighting layout, or document requirements. Sunlurio reviews missing inputs, compliance gaps, product scope, and required engineering files before preparing the appropriate document direction. For the broader service path, review the Engineering Support Overview.

BOQ ReviewTechnical DeviationDatasheetsIES / LDTDIALux / ReluxDrawings & Foundation
Street lighting BOQ markup desk for tender document review
TENDER REVIEW PATH

Tender / BOQ Review Workflow

A clear review path helps buyers move from tender files to a practical document direction before quotation or submission.

STEP 1

Submit BOQ / Specification for Review

Checks: Submit the available BOQ, tender clauses, layout, deadline and required document list through the linked Project RFQ form.

Output: Initial review path and missing-input scan after the available files and project information are received.

STEP 2

Identify Missing Inputs

Checks: Road width, pole height, spacing, quantity, target lux and power supply.

Output: Clarification list for missing technical inputs.

STEP 3

Review Compliance Gaps

Checks: Required files are compared with confirmed product scope and available evidence.

Output: Gap notes and confirmation items.

STEP 4

Confirm Product Scope

Checks: product selection overview, model direction, quantity and road lighting simulation inputs.

Output: Product scope direction for quotation and documents.

STEP 5

Prepare BOQ Matching

Checks: Datasheets, product descriptions and model references are matched to BOQ items.

Output: BOQ matching direction or notes.

STEP 6

Map Required Files

STEP 7

Release Document Direction

Checks: Final document path against scope, configuration, tender stage and availability level.

Output: Suitable document direction or next clarification list.

STEP 8

Confirm Updates / Next Review

Checks: Revised BOQ, updated clauses, document priority and final missing items.

Output: Updated review direction or ready-to-submit document path.

Who This Page Is For

Tender support is useful when project buyers need documents to match procurement, consultant review, or handover requirements.

EPC Contractor

Used for BOQ review, product scope matching, datasheet preparation, IES / DIALux document mapping, and technical clarification before tender submission. Review street lighting project references when project evidence is needed.

Submit first: BOQ, specification, layout, deadline.

Government / Municipality

Used for public procurement review, long-term maintenance planning, acceptance documentation, and technical file confirmation.

Submit first: tender clauses and required document list.

UN / NGO

Used for UN / NGO humanitarian lighting projects, shipment document coordination, installation support, and acceptance / handover requirements.

Submit first: location, application, BOQ, delivery documents.

Engineering Consultant

Used for lighting design inputs, IES / LDT matching, DIALux / Relux support, pole / foundation references, and technical deviation review.

Submit first: layout, target lux, mounting data.

Distributor / Local Agent

Used to prepare document requests for local tenders, municipality projects, and end-user technical comparison.

Submit first: buyer requirement and local tender stage.

Project Owner / Procurement Team

Used to understand required files, missing inputs, and project review steps before quotation or purchase decision.

Submit first: project identity, product path, document needs.

What Buyers Should Submit

Send what is available. A complete package is helpful, but the first review can begin from partial tender information.

Company and Project Information

Company name, project country, application area, buyer role, and project stage.

BOQ and Tender Specification

BOQ lines, technical clauses, material requirements, accepted formats, and submission deadline.

Lighting Layout / Dimensions

Road width, area size, pole location, spacing, mounting height, or available drawings.

Product Path if Available

Solar street light, LED street light, smart lighting, high mast, pole, or flood light direction.

Document Requirements

Required datasheets, IES / DIALux, drawings, foundation, certificates, packing, installation, acceptance or handover files.

Deadline and Priority

Clarify tender deadline, quotation timing, and which documents are critical for the current stage.

Note: If some files are not ready, submit the available information. Sunlurio will identify missing inputs and reply with the next clarification list.

BOQ Gap Review Areas

These review areas reduce tender revision risk without blaming the buyer or delaying early communication.

Most Common BOQ Gap

Product Scope Mismatch

BOQ item names may not clearly match solar street light, LED street light, high mast, pole, flood light or smart control scope.

Sunlurio checks whether each BOQ item can be mapped to a product family, configuration direction, and document release stage.

  • Product family mapping
  • Configuration direction
  • Document release stage

Missing Road / Area Dimensions

Gap: Road width, area size, or layout may be incomplete.

Why it matters: Spacing review may not be reliable without geometry.

Review: We list missing layout inputs before road lighting DIALux support.

Missing Pole Height / Spacing

Gap: Pole height, mast height, spacing, or mounting height may be unclear.

Why it matters: These values affect optics, lux level, and quantity.

Review: We check mounting data against the requested product path.

Missing Photometric Requirement

Gap: IES / LDT, DIALux, target lux, uniformity, or road class may need clarification.

Why it matters: Photometric files should match model, wattage, optics, and layout.

Review: We identify the required photometric inputs and suitable file path.

Missing Structure / Foundation Requirement

Gap: Pole drawings, flange, anchor bolts, wind speed, or foundation references may be required.

Why it matters: Structural files depend on configuration and site assumptions.

Review: We separate lighting pole and foundation reference files from project-specific review.

Missing Delivery / Handover Documents

Gap: Packing list, installation guide, inspection checklist, acceptance documents, and handover files may be required.

Review: We map delivery and handover files by document stage.

Document Pack Mapping

Document support is organized by tender purpose. It is not a promise that every visitor can download every project-specific file immediately.

Product and Technical Files

  • Datasheet
  • Product drawing
  • Specification sheet
  • Model confirmation

Used to match BOQ items, product datasheet and selection path, and tender technical clauses.

Photometric Files

  • IES / LDT
  • DIALux / Relux input and output direction
  • Lighting layout support

Used for consultant review, IES / LDT photometric files, target lux, uniformity, spacing, and optical matching.

Structure and Installation

  • Pole drawing
  • Foundation reference
  • Anchor bolt layout
  • Wiring diagram
  • Control architecture
  • Installation guide

Used for civil coordination, installation planning, and electrical / smart control clarification.

Compliance and Delivery

  • Certificates / test reports where applicable
  • Packing list
  • Pre-shipment inspection checklist
  • Acceptance checklist
  • Handover files

Used for supplier review, delivery control, inspection, and project acceptance.

Tender Support Files

  • BOQ matching notes
  • Technical deviation sheet
  • Tender clarification notes
  • Document list

Used to compare tender requirements with proposed scope and identify missing inputs before submission.

Tender document visual anchors: BOQ review, document pack direction, and acceptance / handover support are shown as safe visual references, not project-specific evidence.
Street lighting BOQ markup desk for tender document review

BOQ Review Visual

Marked BOQ and tender inputs support missing-field review before document mapping.
Tender submission pack mockup for street lighting project documents

Document Pack Direction

A controlled document pack path keeps public samples separate from project-specific files.
Site acceptance checklist measurement points for street lighting project review

Acceptance and Handover

Tender support also covers acceptance checklist, inspection and handover document direction.
Document limitation: Available documents depend on confirmed project scope, product configuration, tender requirements, and document stage.

Document Availability Levels

Public samples in the Resource Center can support preparation, while actual product and project files require confirmation before release.

Public Sample

Public Tender Preparation Samples

  • BOQ input checklist
  • Tender starter checklist
  • Submission folder structure sample
  • Sample datasheet format
  • General document list

Useful for early preparation and internal tender organization.

After Basic Project Info

After Email or Basic Project Information

  • Redacted BOQ matching sample
  • Redacted DIALux / IES sample
  • Acceptance checklist sample
  • Pre-shipment inspection checklist
  • Selected compliance examples

Shared after buyer role, project stage and document purpose are clear.

After Tender / Engineering Review

After Tender / Engineering Review

  • Photometric files: IES / LDT, project-specific DIALux
  • Technical files: matched datasheet, BOQ compliance matrix
  • Drawings: product, pole, foundation, wiring
  • Project documents: certificates, reports, full tender document pack

Released after project scope, configuration and document purpose are confirmed.

Required boundary: Actual project files are released only after project scope, product configuration, tender requirements, and document purpose are confirmed.
BOQ and checklist support for solar street lighting project review

BOQ Inputs Checklist Sample

Public preparation sample for organizing quantities, product path, project inputs, and document needs.

Document support path for solar street lighting project review

Submission Folder Structure Sample

Reference sample for arranging tender document requests by folder stage. It is not a complete final pack for every project.

Tender submission pack mockup for street lighting project documents

Full Document Pack Request

Full tender document packs and project-specific files require confirmed scope and configuration.

Technical Deviation Support for Tender Review

A technical deviation note helps compare the tender requirement with the proposed product scope, document availability, and confirmed configuration. For production-control context, review Manufacturing & Quality. It does not replace final consultant approval or local project engineer review.

Tender Requirement

Identify the tender clause, performance target, document item, or BOQ line that needs comparison.

Sunlurio Proposed Scope

Map the proposed product configuration, document availability, and product scope against the requirement.

Deviation / Clarification Note

Explain what requirement is different, why the difference exists, and what document supports the proposed option.

Required Confirmation

Record what still needs consultant, local engineer, or project owner confirmation before final use.

Requirement vs proposed scope: deviation notes should compare the tender requirement, proposed configuration, supporting document and confirmation still required. This is a review aid, not a substitute for consultant approval.

Tender Starter Checklist

Use this compact checklist before submitting a tender or BOQ review request.

  • Company and project identity
  • Tender deadline
  • BOQ
  • Tender specification
  • Road or area layout
  • Required product path
  • Required lux / uniformity
  • Required datasheet
  • Required IES / DIALux
  • Required drawings
  • Required certificates
  • Packing / installation / acceptance documents

Example File Folder Structure

This sample helps buyers organize requests without implying that one ZIP file covers every tender.

01-Company-and-Compliance02-Product-Datasheets03-Photometric-Files04-DIALux-or-Relux-Reports05-Drawings-and-Foundation06-BOQ-Matching-and-Deviation07-Packing-Installation-Handover
Use case: Example folder structure for preparing document requests. Final files depend on confirmed project scope and tender requirements.

Tender Support FAQ

Answers to common document release, BOQ review, DIALux / IES, drawing, and deadline questions.

Yes. Sunlurio can review available BOQ, tender specifications, project information and document requirements, then reply with missing inputs and a suitable document direction.
Please send the BOQ, tender specification, project location, product path, quantity, lighting layout, road or area dimensions, required documents and deadline if available.
BOQ matching notes can be prepared after product scope, model direction, document requirements and tender stage are reviewed.
Yes, where applicable. A technical deviation sheet compares tender requirements with the proposed product scope and document availability, but it does not replace final consultant or local project engineer approval.
DIALux / Relux support and IES / LDT files depend on confirmed product model, optical distribution, layout, target lux, mounting height and project conditions.
Product drawings, pole drawings and foundation references depend on product configuration, pole height, wind speed, flange, anchor bolts, site conditions and project scope.
No. Public samples may be shared early, but actual product files, project-specific DIALux reports, BOQ compliance matrices, drawings, wiring diagrams, certificates and full document packs require confirmed scope and configuration.
Please submit the available documents and deadline through the Project RFQ form. Sunlurio will review whether a document direction or clarification list can be prepared based on available inputs.

Submit Tender Documents for Review

Send your BOQ, specification, layout, deadline and required document list. Sunlurio will review missing inputs and reply with the suitable document direction or clarification list.

  • BOQ / specification review
  • Missing input clarification
  • Document direction before release

Use this path when BOQ, tender specification or document list is ready for review.

Request a Project Document Pack

Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.