10 m All-in-One Solar Street Light

Review lighting and solar charging for 10 m integrated lights on cold or partially shaded roads. Compare the nightly load, solar window and battery operation under the same site conditions.

SL-AIO-HC integrated solar street light system and component views
SL-AIO-HC head, optic and photovoltaic surface.

Check night load and cold-weather charging

Send the hourly dimming schedule and coldest expected charging conditions. Ask for the battery charge limits and the lowest-month energy calculation for the same model.

SL-AIO-HC integrated solar street light system and component views
Series view

SL-AIO-HC · 80 W

Integrated solar panel and battery

Compare the 80 W integrated option for your pole spacing and weakest solar month. Confirm the panel and battery for the proposed build.

Share the cold morning as well as the long night

Send first

Give the worst charging temperatures and solar conditions you design for, the panel orientation, and the hours at each output level. Say when lighting is essential if the project allows dimming.

What to check

Ask for the exact HC 80 W project version, the actual input schedule, allowable charge and discharge temperatures, and how the device behaves when the battery is too cold to charge.

Separate the 10 m cold-weather charge check from the light calculation

For an exposed road, use the proposed HC 80 W configuration and give the reviewer the coldest expected charging conditions. The light may need to run at night when the battery can discharge. The panel may have energy available the following morning while the controller or battery still restricts charging. Compare these two parts of the operating cycle separately.

CheckWhat to request for the quoted configuration
Road arrangementFixture IES, mounting angle and road result under the same spacing and road width.
Night demandActual input at each stage of the schedule, with the night hours and usable battery reserve.
Cold charge windowAllowed charge and discharge conditions, protective behaviour and a low-sun recovery example.

Read Wh at the pack level and compare permitted usable energy at the design temperature. If the site needs another enclosure or a change in operating settings, reference the approved charger, controller and battery in the order. This gives commissioning a specific configuration to check.

Other Sunlurio options to compare

SL-ONE-AF luminaire front and solar panel rear views

SL-ONE-AF

AF1 for hot sites · AF2 with optional battery insulation for cold sites

Compare the AF using the proposed battery and controller. Ask how charging resumes after a low-temperature restriction at the site.

SL-ONE-TJ luminaire and integrated solar panel

SL-ONE-TJ

If a later batch will repeat the layout, request the TJ fixture, measured input schedule and battery charging limits for the proposed version.

SL-ONE-GM all-in-one solar street light for public area lighting projects

SL-ONE-GM

If the far edge still fails the layout criteria, compare a GM optic on the same cross-section and recheck the energy demand for its actual input.

What to confirm before buying a 10 m integrated light

  • Model and fit. Read the sleeve drawing and service clearance for the proposed head, especially where the pole will be reused. Ask for the matching drawing
  • Road and winter operation. Compare the same road layout and confirm the night schedule, usable battery capacity and charging temperature. Review DIALux support

Confirm the required light and the difficult season

A highland road can need a longer lighting period when the available charging window is shortest. Begin with the mounting position, carriageway width, setbacks, pole spacing and night operating schedule. Mark road segments where the conditions differ, such as an exposed ridge and a bend cut into a hillside. Give the supplier the location and conditions for the least favourable season. An installation at 10 m still needs a useful view of the sky. Trees, slopes or buildings can shorten charging hours at individual poles even when some parts of the road remain open.

In one past enquiry, a buyer described 10 m poles on a 9 m urban road, with low temperatures and cloud during part of the day. Those inputs raised two separate decisions. The road needed an optic and layout appropriate to the width and pole positions. The solar system needed a charging and operating assessment in those conditions. Ask for two reviews of the same proposed configuration. If a project can use a different mode after traffic falls, have the owner agree it before either review, so the lighting design and energy schedule describe the same operation.

Know what the light actually uses each night

For each time block, state the intended light level or mode and the electrical draw at that level for the proposed fixture. Add the time blocks to get the energy drawn by the load. For illustration, four hours at 45 W and seven at 18 W use 306 Wh at the load. Keep the losses and other loads that the supplier identifies in the full energy balance. An earlier reduction in output can lower the nightly demand, but it belongs in an approved lighting plan if traffic, work or pedestrian use persists at that time.

Ask how the controller behaves if the battery reaches a low state of charge. Establish which lighting periods need priority and which may run at a lower agreed level. If the operation mixes scheduled dimming and a sensor, clarify when the higher output applies and how long it continues. That can affect both the energy assessment and how the road will be checked during commissioning. Keep the agreed profile tied to the controller reference. A catalogue’s longest runtime can relate to a much lower mode or different operating conditions from the project’s required lighting.

Separate cold-weather lighting from cold-weather charging

Ask for the battery’s charge and discharge limits in the intended assembly, the controller and protection response, and any temperature information specific to the configuration. A system can be able to light at a temperature where charging is restricted. A shift in the morning charging hours can matter if the photovoltaic surface only receives its best sun early. Ask how the selected system responds and how the owner will confirm the behaviour on site. Use the documented limits for the actual battery and control arrangement when reviewing the least favourable period.

The location of the temperature measurement also matters. Air in a weather report can differ from the conditions at a cell and inside a sunlit enclosure. Share the site temperature range and relevant operating hazards, and confirm how the supplier accounts for them for the chosen housing. If the project needs specific performance during unusual conditions, identify what evidence would substantiate it. An operating temperature on a luminaire sheet is a useful starting point. The energy review still needs the battery and charge-control limits and the availability of usable energy at the required time.

SL-ONE-AF luminaire front and solar panel rear views
SL-ONE-AF optic and photovoltaic surfaces.

Review charging limits for the winter operating window

Send the temperature range during charge hours, panel orientation and night schedule. Ask for the pack and controller references to appear beside the permitted charging conditions and low-sun recovery review.

Include service access in the cold-weather proposal. Show how the approved head can be reached in the season when charging may be limited. Send the existing pole and arm drawing, base detail and any site electrical or earthing requirements. The maintenance team can then tell whether the proposed access and isolation method works in practice.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Review cloud, shade and recovery on the same schedule

Cloud and fixed shadows affect charging in different ways. Identify the times and solar directions when buildings, trees or hills obscure the panel, and give the designer site and seasonal information for the estimate. If cloud recurs during a specific part of the day, present it as a design concern rather than assuming that a certain number of daily sunshine hours is available. Request the charging basis and the usable reserve for consecutive weak days. Ask how much energy can be restored when conditions improve and what lighting profile will be used during the recovery.

Compare the proposed changes one at a time. A placed or angled panel may gain more useful exposure. A better lighting distribution could meet the road requirement with a different load profile. A larger usable reserve can carry the system farther through weak charging when it starts with sufficient energy. If the integrated arrangement keeps the panel in an unfavourable position, a separate panel can be reviewed with its own bracket and service conditions. Record the installed orientation assumed for each option and the criteria that the client expects it to meet.

Check the road result at the output you will use

Provide the lighting reviewer with the positions, exact photometric file and the operating condition promised in the energy schedule. If the road is specified in both an early and a late period, assess both when the agreed requirements differ. Ask the designer to point out the weakest section, especially the far side of the carriageway, curves or long spaces between poles. If the pole location or optics are modified to improve a result, check whether it affects the installed panel direction. Show the resulting head and solar surface orientation in the drawing that will be issued to the crew.

Give the structural reviewer the selected head and its fit on the pole, including the intended angle and any other attachments. Confirm which support information is needed for local approval and how the system will be accessed. A head chosen for its larger integrated solar surface can change more than the charging estimate. Revisions to the mount, pole or access plan should be visible with the option. Agree the differences with the project team before any civil dimensions or repeated mounting hardware are released.

Sunlurio goniophotometer photometric testing lab for street lighting IES and LDT review
Photometry equipment used to prepare luminaire distribution files.

Check the cold-weather configuration on the equipment list

Verify the pack, BMS and controller references against the intended working limits. Use the accepted settings record to tell the commissioning team what temperature-related restriction the proposed arrangement may show.

Battery power unit assembly and wiring check for solar lighting system matching
Battery-unit assembly and wiring.

Ask for usable records at delivery and handover

Match the purchased light to the approved optical, electrical and mounting information. Request the data sheet, photometry used for the layout, the battery and control conditions needed for the design and the settings record. Give the first unit an identifier and check whether it is representative of the configuration installed along the road. If certain poles use a different optic, housing or programme, list their identifiers separately. Mark the parts used during later repair so maintenance can restore the approved configuration without guessing from the exterior of the light.

If the condition you need to verify only occurs in winter, agree what evidence is acceptable before the roads are released for installation. A trial during a warmer week can check fitting, optics and controller settings. Keep those results with the installation record and define how seasonal performance will be reviewed. Include the operating period, controller state and charging observations that you need to compare. Sharing those details with the owner early makes it possible to agree which results settle the purchase and which results will be reviewed later.

On site, verify the installed aim, location and controller programme before assessing the light. Arrange the approved road measurement and a charging or mode check under appropriate conditions, with the time and the environment documented. If the project requires a winter performance check, plan for it and specify how it will be measured. Keep the initial installation results and the later seasonal evidence as separate records. That gives the owner a way to understand where a charging or control problem occurs and who should review it when the installation is already in service.

Street lighting container loading review for cargo placement separation and movement control
Export loading and cargo separation.

Make the cold-weather assumptions part of the order

Use the same pack in both reviews

Match the pack, controller and panel codes in the energy review and the offer. Ask for the permitted usable energy at the stated conditions.

Compare recovery after low sun

Review how the pack recovers while continuing to supply the scheduled night load. Ask whether the proposed installation or operating settings change in cold weather.

Give the crew commissioning settings

Keep the controller profile and expected charge restrictions with the site handover. Ask which indications show a temperature restriction and who will handle persistent faults.

Check low-temperature charging and the night load separately

A highland road enquiry in our records had cloud cover for part of the day. That description helps identify the issue, but hours of visible daylight do not tell you the energy a panel collects. Compare the least sunny month, the lowest likely battery temperature and the proposed dimming schedule. Ask for the charging limits and the effect of any battery protection on usable energy.

Keep the battery reference with the shipment paperwork

Confirm how the actual pack is identified on its labels, packing list and applicable transport documents. Keep a copy of the controller settings and site-specific handling instructions with the correct shipment.

Ask how cold-weather faults will be checked. Keep the accepted charge temperature limits and night schedule with the order. Ask us to state coverage for the chosen battery and control parts, the start date and the first information needed if a light stops charging. A record of site temperature and controller status gives the service team a useful starting point.

LED street light packaging line with carton marks packing photos and shipment preparation
Carton marking and packing preparation.

Questions for an exposed or cold site

Send the location, typical and low temperatures if you have them, and the period of the year when they occur. Add any observations of snow, frost or predictable morning shade. Ask what further measurements or assumptions are needed to compare systems. The temperature basis can then be agreed with the project reviewer before it is treated as a performance condition.

Storage can cover an agreed deficit while it has energy available. Review how the panel recharges it in the selected period and whether the owner accepts any reduced mode during recovery. Compare moving or reorienting the photovoltaic surface, changing the optics or schedule and using a separated panel if those choices fit the site.

Use a position that represents the equipment group reviewed by that estimate. Where another group faces substantially different shading or orientation, identify it separately and use relevant inputs. If some positions do need a different arrangement, mark them on the pole schedule before the equipment and mounting hardware are ordered.

Choose a representative position that includes the key constraint and that the owner can use for a repeatable field check. Agree what can be verified now and which conditions need seasonal verification. Keep the trial data tied to the exact configuration and schedule, particularly if later batches will use another head, battery or optic.

Send the site plan, pole and arm dimensions, date and time of shade observations and the required lighting and schedule. Share any site records about winter weather and the owner’s minimum late-night service requirements. These are the inputs we need to discuss the actual mounting, photometric and charging options for the same installation.

Use it to see how the supplier structured the review. Check which equipment and temperatures were represented and ask for the evidence that applies to your own installation. If cold charging or after-dark recovery is central to the decision, agree a suitable test condition and what operation will be evaluated there.

Ask for the model-specific charging temperature window and how the battery protection behaves below it. The useful comparison combines available charging time, usable battery energy and the actual nightly load.

Convert each nominal rating to watt-hours using its nominal voltage. Then compare usable energy under the agreed temperature and protection settings, and check how quickly the panel can recharge it.

Charging and discharging can have different limits. Ask the equipment supplier how the proposed pack and controller behave at both ranges and how they resume charging after a restriction.

Review My Cold-Season Operation

Send the site location, lowest conditions, shading or cloud patterns, road dimensions and the night lighting schedule.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.