Solar Street Light Project References
Selected deployments with scope, typical configurations, and site photos.
Project files can be shared in a redacted format or under NDA when required.
What Each Reference Includes
A consistent proof structure to support tender reviews and internal approvals.
- Project scale (qty, scope, and application)
- Configuration snapshot (typical assumptions)
- Site photos (installation and night results)
- Typical tender deliverables (on request)
Featured Case Studies
A small selection of deployments. More references can be shared based on your country and scope.
13000 sets solar street light in Togo
Togo | 13,000 Sets | Road & Highway | IES / BOQ
12000 sets of solar street lights in Ghana
Ghana | 12,000 Sets | Main Road | IES / BOQ

890 sets street light in Cote d'Ivoire
Côte d’Ivoire | 890 Sets | Road & Highway | IES / BOQ

500 sets solar street light in Burkina Faso
Burkina Faso | 500 Sets | Main Road | IES / BOQ
More references are available by region and product category—share your country and scope.
Typical Configuration Snapshot
Each reference highlights typical project assumptions (layout, pole height range, and control strategy) without exposing client-specific parameters.
If you share your road type, quantity, and target outcomes, we can provide a tailored configuration summary under NDA when required.
Typical Inputs
| ✓ Road type / target lux |
| ✓ Mounting height range |
| ✓ Pole spacing range |
| ✓ Autonomy nights (LiFePO₄) |
What We Verify
| ✓ Photometry & layouts |
| ✓ Dimming profiles |
| ✓ Battery sizing vs. temperature |
| ✓ Pole & QC checks |
Typical Tender Deliverables (On Request)
Some project-specific files are confidential and can be shared in a redacted format or under NDA when required.
Tell us your country, quantity, and submission checklist—we’ll reply with the most relevant document pack.
Request a Similar Proposal (24H)
Share your country, quantity, road type, and submission checklist.
We’ll reply within 24 hours with a recommended configuration range and a document list (redacted or under NDA if required).
What you’ll get in 24 hours
🧩
Configuration snapshot (typical assumptions)
📈
IES / DIALux availability list (by model)
🧾
BOQ mapping notes for procurement
✅
QC / delivery evidence on request






