Lighting Engineering Support for Project-Based Outdoor Lighting
Sunlurio helps EPC, municipal, consultant, UN / NGO, distributor and tender buyers turn project inputs into lighting configuration direction, document support paths and engineering-review boundaries.
Engineering Review Summary
Before quotation or document support, buyers should provide the basic project inputs that affect product selection, lighting performance, document availability and tender response quality.
Start with project inputs, not a fixed wattage.
The review path is clearer when road geometry, working schedule, product family and document stage are visible before quotation or tender support begins.
Project input review covering road geometry, luminaire selection, control scope, pole interfaces and document requirements.
Project Location
Country / city, project type, road class, site environment and corrosion or wind conditions.
Geometry & Quantity
Road width or area size, pole or mounting height, spacing, quantity and project stage.
Solar Runtime Inputs
Working hours, dimming schedule, backup days and product type where solar is involved.
Tender Documents
BOQ, drawings, tender specification and required document list where available.
Three Project Paths
Choose the route that matches the project stage before requesting quotation, tender support, photometric review or engineering document direction.
Preparing a Quotation
Choose this route when the project stage and buyer role match the sequence below.
- Submit project inputs
- Confirm product path
- Review missing information
- Preliminary configuration direction
- Request project-based quotation
Preparing a Tender
Choose this route when the project stage and buyer role match the sequence below.
- Upload BOQ / tender specification
- Review compliance gaps
- Confirm product scope
- Map required documents
- Request tender document pack
Consultant / Technical Review
Choose this route when the project stage and buyer role match the sequence below.
- Submit CAD / road layout / area dimensions
- Confirm lighting targets
- Match IES / LDT
- Request DIALux / Relux review
- Confirm drawings and datasheets
Project Input Requirements
Different lighting systems require different starting data. Missing geometry, power, runtime or document inputs can change the configuration and the available document path.
Solar Street Light
Prepare these inputs before requesting configuration review or document support.
- country / city
- road width
- pole height
- spacing
- quantity
- working hours
- dimming schedule
- backup days
- product type if known
- required documents
- BOQ / drawing availability
LED Street Light
Prepare these inputs before requesting configuration review or document support.
- voltage / frequency
- road width
- pole height
- spacing
- target lux
- uniformity
- optical distribution
- SPD
- control requirement
Smart Street Light
Prepare these inputs before requesting configuration review or document support.
- control method
- communication method
- platform requirement
- GPS
- dimming
- fault alerts
- cabinet condition
- data / API requirement
High Mast
Prepare these inputs before requesting configuration review or document support.
- mast height
- area size
- number of floodlights
- target lux
- uniformity
- wind speed
- lifting system
- foundation requirement
- control cabinet
Lighting Pole
Prepare these inputs before requesting configuration review or document support.
- pole height
- material
- wall thickness
- top / bottom diameter
- arm type
- flange
- anchor bolts
- wind speed
- surface treatment
- drawing requirement
LED Flood Light
Prepare these inputs before requesting configuration review or document support.
- area dimensions
- mounting height
- beam angle
- target lux
- uniformity
- AC or solar
- DIALux / IES requirement
High Mast Calculation Inputs
For high mast projects, buyers should prepare area dimensions, target lux, preferred mast height, application type, obstruction zones, wind-speed requirement, and required documents. A first-pass high mast lighting calculation can help define the starting point before DIALux / AGi32 simulation and BOQ matching.
Main Configuration Risks
Engineering review is used to catch configuration, document and tender mismatches before quotation or submission.
Wattage-Only Selection
Choosing only by wattage can miss road width, optics, pole height, spacing and target lux.
Missing Geometry
Road width, pole height, mounting height or area dimensions are needed before meaningful review.
Solar Undersizing
Working hours, dimming schedule and backup-day assumptions affect battery and PV sizing.
Wrong Photometric File
IES / LDT files must match model, optics and project purpose before simulation use.
No DIALux Verification
Tender or consultant review may require simulation checks instead of catalogue assumptions.
Pole / Foundation Risk
Wind load, corrosion, flange, anchor bolts and foundation assumptions must be bounded.
Coastal Corrosion
Surface treatment and material choices need review for coastal or high-humidity environments.
Tender Document Mismatch
BOQ, drawings, datasheets and compliance documents must match the confirmed product scope.
Engineering Deliverables
Sunlurio can support quotation, tender, consultant and project-review workflows with engineering documents. Availability is not automatic and depends on confirmed inputs.
Product & Photometric Files
Datasheets, model-matched IES / LDT files and DIALux / Relux review paths are confirmed against the proposed luminaire, optics, mounting condition and project purpose.
- datasheet
- IES / LDT path
- DIALux / Relux review
- optics / model matching
Drawings & System References
Datasheets, product drawings, pole interfaces, foundation references, wiring diagrams and control architecture are released according to the confirmed project scope.
- product drawing
- pole drawing
- foundation reference
- wiring diagram
- smart control architecture
Tender & Handover Support
BOQ matching notes, technical clarification, packing references, installation guidance and acceptance documents are mapped to the confirmed product and tender stage.
- BOQ matching notes
- packing list
- installation guide
- acceptance / handover checklist
Document Availability Levels
Available documents depend on confirmed project scope, product configuration, tender requirements, and document stage.
Public Sample / General Guidance
Public sample. General materials can guide early review without implying project-specific document release.
- catalog
- public checklist
- generic input sheet
- sample datasheet
Request After Basic Project Information
Project info required. Samples and review materials are shared only after the buyer provides enough context for safe matching.
- redacted IES / DIALux sample
- sample BOQ matching sheet
- pre-shipment checklist
- acceptance checklist
- selected compliance documents
Engineering Review Only
Engineering review required. Project-specific files are not public downloads and must match confirmed model, optics, drawing scope and tender purpose.
- actual product IES / LDT
- project-specific DIALux report
- matched datasheet
- BOQ compliance matrix
- technical deviation sheet
- pole drawing
- foundation drawing / reference
- anchor bolt layout
- wiring diagram
- smart control architecture
- full certificate / test report set
- full tender document pack
Use Request / Available on request / Engineering review required instead of public download buttons.
Engineering Tools & Document Paths
Use the relevant engineering path to prepare project inputs, match photometric files, review drawings or organise tender documents before quotation and submission.
Simulation path
DIALux / Relux Simulation
Review road or area geometry, maintained illuminance, uniformity and layout assumptions.
File-matching path
IES / LDT Photometric Files
Request files matched to the proposed model, optics, wattage and mounting condition.
Document path
Drawings & Datasheets
Confirm datasheets, product drawings, pole interfaces and reference document availability.
Tender path
Tender Documents & BOQ
Map BOQ lines, compliance gaps, required files and submission boundaries.
Review method
Project Lighting Method
See how project inputs are checked before configuration, simulation and quotation.
Calculation guide
High Mast Calculation Guide
Define a first-pass mast count and lighting layout before detailed simulation.
Tender Starter Pack
Tender / BOQ customers should submit the files and requirements that define product scope, compliance direction and document timing.
BOQ / Specification Review
We compare the requested scope with product path, document needs and potential compliance gaps.
Document Mapping
We map datasheets, drawings, IES / LDT, DIALux / Relux, compliance documents and tender package boundaries.
Related Products
Engineering review normally starts by confirming the product path before document or simulation support.
Solar Street Light
Solar lighting inputs, backup days, dimming schedule and road geometry.
LED Street Light
AC road lighting review for voltage, optics, lux target and SPD.
Smart Street Light
Control method, communication path, platform and data interface review.
High Mast Light
Area lighting, mast height, floodlight quantity, wind speed and lifting system inputs.
Lighting Pole
Pole height, material, flange, anchor bolt, wind speed and drawing requirement.
LED Flood Light
Area dimensions, beam angle, mounting height, lux target and DIALux / IES path.
Related Projects
These public references are used as safe examples of project context, product category and review boundary. They are not presented as universal document proof.
Togo Road & Highway Solar Street Lighting
Solar road lighting reference for country, road width, pole height and backup-day review.
Ethiopia Smart Lighting Project
Smart lighting reference with safe control-scope and document boundary framing.
Tema Port High Mast Lighting Project
High mast reference for port-area lighting, wind load and commissioning review.
Vietnam AC LED Street Lighting Project
AC LED street lighting reference for pole height, optics and driver / SPD review.
Engineering Support FAQ
Send country, city, project type, road or area dimensions, pole or mounting height, spacing, quantity, working hours, backup-day needs where solar is involved, and available BOQ or drawings.
DIALux / Relux review can be supported after project geometry, target requirements, luminaire model and document purpose are confirmed.
IES / LDT support depends on confirmed product model, optics, project purpose and document stage. Actual project files are not treated as public downloads.
Yes. BOQ and tender specifications can be reviewed for product scope, compliance gaps, missing inputs and document mapping.
Pole drawings and foundation references may be reviewed after pole height, wind speed, material, flange, anchor bolts and project scope are confirmed.
No. Some files are public samples, some are available after basic project information, and some require engineering review.
Yes. Submit the available project conditions and choose the closest product path or explain that the product type is not confirmed.
The engineering team reviews the inputs and replies with a suitable configuration direction, missing-information list, quotation path or document-support path.
Need Engineering Review Before Quotation?
Send the project inputs first, then Sunlurio can route the request to quotation, tender, simulation, document or product-path review.