9 m All-in-One Solar Street Light

Check which existing 9 m poles can be retained for an integrated solar retrofit. Review the mounted head geometry, access and the lighting path before planning repeated installations.

SL-ONE-DR five product illustration
SL-ONE-DR 80 W with five LED modules.

Check retained arms before a phased retrofit

Group the existing poles by arm diameter and condition. Approve the first fitting in each group and record its optic and service clearance before later deliveries.

SL-ONE-DR five product illustration

SL-ONE-DR · 80 W

5 LED modules · 120 Wp panel · 678.4 Wh nominal battery · Ø80 mm mounting interface

Consider the 80 W DR where the existing arm can accept the approved mount and the crew can reach the battery drawer. Check the optic and the actual night schedule before approving a trial on retained poles.

Separate poles you can keep from poles that need work

Send first

Send a list of retained pole groups and photos of one representative arm from each. Mark the difficult-access locations and where the existing pole or foundation needs assessment.

What to check

Use the 80 W DR as a retrofit candidate where the arm and battery drawer fit. Ask for the agreed mount, lens and service clearance before treating a trial unit as the reference for a later batch.

Run a 9 m retrofit sample for each group of retained poles

Sort a multi-street retrofit by arm profile and condition before specifying the DR 80 W candidate. The point is to identify how many fittings you actually need, which poles need their own checks, and which approved sample can represent each later shipment. Plot the groups on the pole schedule at the beginning.

Gate before releaseWhat becomes part of the record
Representative fittingArm measurements, attachment revision, the actual lens and the clearance available to remove the battery.
Pilot fixtures at nightRecorded aiming, controller schedule and road observations by pole group.
Next purchase batchApproved part identifiers, drawing revision, and any spares reserved for the installed group.

Sunlurio’s published Ghana case can help a buyer think through a phased order. Use its procurement pattern to plan a sample and later releases for your own streets. Approve your own equipment and pole groups before any old fitting assumptions carry forward.

Other Sunlurio options to compare

SL-ONE-AF luminaire front and solar panel rear views

SL-ONE-AF

AF1 for hot sites · AF2 with optional battery insulation for cold sites

If the AF is proposed for one phase, ask for its mounting and controller revisions so crews can identify the correct maintenance procedure.

SL-ONE-TJ luminaire and integrated solar panel

SL-ONE-TJ

For phased delivery, ask which TJ fixture and attachment can be approved with the first pole group and identified on later cartons.

SL-ONE-GM all-in-one solar street light for public area lighting projects

SL-ONE-GM

When one group of old arms has a different tilt, review the proposed GM variant for that subset before accepting a common fitting.

9 m 80 W all-in-one solar street lighting project in Ghana

9 m project reference in Ghana

Sunlurio supplied 12,000 sets of 80 W all-in-one lights with 9 m poles in two order stages. For a phased order, record the approved lens, arm fit, controller settings and replacement part references before the next batch is released.

Read the Ghana all-in-one case

Decide which existing poles are worth retaining

An existing 9 m pole can save civil work if its condition, geometry and approved capacity suit the proposed light. Begin by asking the owner for the original pole and foundation drawings, any repair records and photographs of the base and arm. Record which attachments have been added since the drawings were issued. Put the retained poles on the site plan and mark the ones the installation team can reach. A pole near a busy junction or steep verge can cost more to service even where it takes the same lamp as the rest of the road.

Divide the route by pole family, installation conditions and observed problems. An old drawing may apply to most of the route and miss poles replaced during earlier repairs. Ask the appropriate surveyor or reviewer to identify differences that matter for structure and the mounting. Check which groups already need further inspection before the quotation is issued. This can reveal a useful mixed scope. The client may be able to retain some assemblies, replace others or change the type of solar light where solar exposure or service access would make the integrated head a poor fit.

Give the reviewer the installed equipment geometry

An all-in-one housing carries the photovoltaic surface, the light and its associated equipment on the same assembly. Ask for the head’s weight, dimensions, installed angle and the position of its connection. Include the proposed adapter and arm and provide them together with photographs of the existing joint. The reviewer needs to see which physical arrangement will be loaded at the site. A compact existing fixture can have a very different exposed shape from a longer panel housing. A replacement with a similar mass can also sit farther from the pole centre.

Provide the basis needed to evaluate wind, the structure and the foundation for the actual site. Record other attachments, such as a sign, cable bracket or camera. Give the proposed assembly drawing to the reviewer and ask them to confirm which poles the outcome applies to. Put method and approval responsibility into the project document list. A light-body test or a statement about the head on its own has a different scope from the check of a retained arm, mast and foundation. Order only the pole groups for which the proposed equipment can be assessed with the appropriate records.

A batch of long lighting pole shafts stacked in the workshop
Pole shafts staged in the workshop.

Review the fitting while the head is still on the drawing

Provide the actual pole or arm diameter, seating length and any change in shape near the fixing. Measure how much of the straight length can be used once nearby collars, screws or cable entries are considered. If brackets have been fitted in multiple directions, photograph and label the variants. Ask the head supplier for the selected mount drawing and the permitted orientations. A field adapter can change the mounting position and what the structure must carry, so include the exact part in the review and installation schedule before counting it with the heads.

Check which layout affects maintenance access. Show where a lifting platform can park, where the working side will be and the clearance needed for access to the battery or controller. High-level work can become difficult when an adjacent wall, branch or service crosses the platform position. On a road that stays in use, ask the site team to identify the likely traffic management or permissible working window. Compare the recurring maintenance burden before deciding to keep an awkward pole. Where suitable, use a first installation to see whether the approach and working space assumed on the layout are available.

SL-AIO-HC high-configuration all-in-one solar street light
SL-AIO-HC head and pole interface.

Review different retained arms as separate jobs

Provide the installed geometry and mounting photos for each representative pole group. Use the road review to decide which groups can apply the same mount and optic, and which awkward arms or locations need another option.

Survey the base and service opening by pole group. Record the condition of the base plate, accessible fixings and service door for each retained pole group. Let the structural and electrical reviewers assign any repairs, earthing checks and local work before the batch is committed. Put groups that need different work on separate release lines.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Prove the proposed aim on the existing route

Plot the actual pole positions, mounting height of the light centre and arm direction. Model the intended road width, bend and spacing using the selected optics and operating setting. Ask the designer to show the treatment of wide sections, the far edge and any crossing. Using the existing pole marks can reveal where a bearing or position differs from the original lighting plan. If a layout only works on paper with the head angled beyond the approved mount or with an arm reaching farther than the existing one, resolve that difference before the buyer accepts the proposed equipment.

At each difficult location, check the integrated panel orientation that follows from the road layout. Ask for a review of nearby obstructions and the relevant charging period before deciding that the whole route can use one head and setting. A problem may affect only a few poles where the old arms face the wrong direction or where a structure blocks the solar surface. Compare the effects of a different optic, a reviewed bracket change or an independent panel at those positions. The options are easier to weigh when the consultant sees the actual pole schedule and not just the nominal 9 m height.

Sunlurio goniophotometer photometric testing lab for street lighting IES and LDT review
Photometry equipment used to prepare luminaire distribution files.

Separate first cost from what it takes to reach the equipment

The retrofit cost includes the head and the work needed to make it fit and keep it in service. Compare whether a platform, traffic control, scaffold approval or a special bracket is required for common tasks. Ask what happens if a controller or battery needs replacement and which spare is intended for the arrangement. If the existing lighting is to be changed in sections, state which routes must stay in operation while work is underway. Include that sequence in the estimate, especially where crews have limited access or need to return at night to check the results.

Use one comparison for the retained route and a second for the poles that require special work. A low head price applied to every pole can hide the higher access cost on an isolated group. If replacing an unusable pole involves civil approval, put the lead time and coordination in the decision even before detailed pricing. The completed scope should identify the person responsible for the pole review, the mounting check, any local works and the commissioning record. Keep the replacement-part references and expected access procedure with the installed equipment list.

Freeze the accepted fitting before the next batch

Keep the approved optic, sleeve, fasteners and controller settings with the trial record for each group. Compare the first units of the next batch with those same references before sending them to the crew.

LED street light final assembly line with luminaires prepared for project orders
Luminaire assembly and finished-product preparation.

Inspect and record the first installation by pole group

Pick a pole from a common group and a constrained one where the fit, access or solar orientation differs materially. Agree what the inspection should prove. Record the model, optic, mount, position, site conditions and control mode. Have the responsible team match the installed arrangement to the drawings, then check the light at the points and operating condition set in the approved plan. If the installation reveals a clearance or aiming issue, identify the affected group and have the proposed change assessed before the crew applies it elsewhere.

Before assigning a spare for a retained-pole group, check the maintenance instructions for the installed mount along with the parameters of the head. An approved successor may need a different bracket or setting. Ask the supplier to identify the intended replacement and the documents used to approve its interface. Save the current and replacement part numbers by pole group and give the service crew a copy. If the old part is eventually discontinued, the list helps the owner identify where an alternate mount or a revised procedure would be needed.

Before delivering the rest of the batch, count the approved heads and mounts by group. Match them to the expected labels and keep any special hardware traceable to its pole positions. On handover, file the approved structural and interface references, lighting results and settings together so a replacement can be ordered against the actual equipment. If part of the route retains its original lighting while other positions change to solar, mark those boundaries on the inventory. Supply and service responsibilities should follow what was actually installed.

Make the next delivery match the accepted trial

Split the scope by pole group

Keep replacement heads for retained poles separate from complete sets for new positions. Show the adapters, access equipment and civil work each group needs.

Approve the first group

Keep the proven sleeve and optic, the aim and dimming schedule, and photos showing the actual clearance. Identify which pole IDs are covered by the trial.

Give receiving staff the same reference

Ask for the accepted codes and revision on the packing list. Keep group-specific spares together and reopen the affected checks if the mount or lens changes.

Keep the approved parts visible across shipments

Ask for cartons and site records to identify the fixture, lens and fitting approved for each group of poles. Keep group-specific spares labelled separately at the depot. When a later shipment arrives, compare the labels and mounting parts with the previous approved set before distributing cartons across streets.

Release and label each retrofit group on its own line

Keep new pole sets, retained-pole heads and spare mounting hardware on distinct packing lines. Tag the batch and compatible pole group so stock can go straight to the correct streets.

Record warranty by retrofit phase. Put the dispatch window, approved equipment and warranty start event on each release. Ask us to distinguish coverage for the new head from responsibility for a retained arm or pole. Keep the phase, fitting code and trial record together so a later replacement can be matched to the correct shipment and operating settings.

Finished solar lighting products arranged for warehouse checking before shipment
Finished products arranged for a warehouse check.

Retained-pole retrofit questions

The model name helps locate drawings. The responsible reviewer still needs the condition and the installed equipment and attachments for each group. Include foundations and anchors where applicable, particularly if the original construction differs from its drawings or repair records are incomplete.

Collect the best available photos and records, then arrange a reliable site measurement before approving the connection. Make the remaining dimensions and access limits clear in the initial review. A provisional comparison can proceed with its assumptions recorded while the fit and engineering reviewer waits for actual measurements.

Mark the existing pole locations and likely obstructions, then look at the panel level and planned aim. If the site is constrained, photograph or survey in the relevant directions and give the designer the operating season. Clarify that issue before spending time reviewing multiple head and mounting choices for those same positions.

Use the road layout and service requirement to define the output and optical distribution. The mounting height is part of that geometry. Compare the proposed IES and aim with the required results across representative positions, then check what the selected nighttime modes require from the battery and panel.

Yes, if the reviewer has approved the intended trial equipment and scope. Select the positions that will expose fit, shading or service constraints and agree how findings will be logged. Use the trial to clarify which pole groups can repeat that arrangement and which need a different solution.

Keep the approved assembly drawing and the adapter part number with the pole IDs. Record the intended orientation and the relevant service instructions. Buy any spare adapter against that reference. The next maintenance crew should be able to confirm the part before taking the old fitting down.

First check actual outside diameter, usable seating length and fitting tolerances. Ask for a pole condition and structural review where the mounts, loads or records differ from the approved setup.

Mark the relevant pole numbers, the approved head and mounting revision, and any change to road optics or the night program. Keep the sample and delivery records tied to the same phase.

Group them by arm design, condition and available clearance. Review a representative pole for each group and make the approved bracket and lens traceable to that group.

Review My Retained Pole Layout

Send the old pole and foundation drawings, interface photos, nearby attachments, access conditions and route dimensions.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.