Check the roadway between the poles before choosing a 7 m integrated solar light. Use the actual pole positions, minimum light levels and uniformity target to compare optics and night settings.
Send the road width and planned spacing. Ask for the minimum and average light on the same calculation grid for each candidate optic.
3 LED modules · 70 Wp panel · 384 Wh nominal battery · Ø60 mm mounting interface
Start the road calculation with the matching 50 W optic and check the darkest point between poles.
Send first
Share lane widths, spacing, mounting height to the light centre, overhang, tilt, and the required lighting criteria. Highlight entrances or crossings where the minimum light matters.
What to check
Ask for the exact optic, IES and fixture code used to calculate the 50 W DR candidate. Use the same road grid to compare any change in lens, fixture or spacing.
Start the road calculation with the actual outside lane or path edge, not just the centreline. Use the proposed road width, spacing, arm overhang and mounting angle. The 50 W DR is a starting candidate. Compare the selected optic on the same calculation grid as any alternative so the change can be traced to the light or its distribution.
| Result on the trial road | What to investigate first |
|---|---|
| Strong light under each pole and dark gaps between | Review spacing and the longitudinal distribution of the optic. |
| The centre looks adequate and the far edge is weak | Check lateral distribution, overhang and tilt on the actual cross-section. |
| Minimum and average lighting are both below the target | Review the whole arrangement before increasing output. Re-run the night energy calculation for any change in input power. |
For a tender comparison, keep a copy of the reported minimum, average and required uniformity with the matching IES file and fixture code. If a proposed replacement changes the lens, ask the supplier to show the revised results on the same road before approving it.
For several road segments, request the TJ fixture code and matching IES to compare the dark points across the same grid.
If the opposite footway is underlit, request the proposed GM optic and compare minimum light across the full section.
At 7 m, a bright area next to a pole tells you little about the road halfway to the next pole. Start with the space that drivers or pedestrians must use between the lights, including the far edge of the pavement and any crossing. Give the designer the width, pole spacing, setback, arm outreach and the position of the light centre. Ask the owner which parts of the road form the assessment area. If a shopping entrance or junction widens the route, identify it as a separate condition and show its position on the plan.
One set of purchasing inputs in our project records used a 7 m mounting height, 30 m spacing and an 8 m road. The brief set a 10 lx average and a 3:1 average-to-minimum ratio. Taken as written, that combination at the stated average implies a minimum of about 3.33 lx. Those figures describe the request. Confirm the acceptance levels, the precise meaning of the ratio and the point grid with the owner for your road. On another 7 m job, two staggered sides, a different setback or a different road width can change the design. Use the pole schedule and the actual site section when you compare fixtures. Measure height from the same finished-ground datum the layout uses.
Ask what the specification means by minimum and average. Minimum is the lowest calculated or measured value on the agreed set of points. Average describes the set as a whole. Where the project defines overall illuminance uniformity as minimum divided by average, an illustrative set with an average of 12 lx and a minimum of 3 lx gives 0.25. A proposal with a higher average and a deeper dark area can give a poorer ratio. Ask the lighting reviewer to apply the required metric and limits to the road type and calculation area in your project.
Confirm what units and method the tender or owner uses. A residential street may be specified through horizontal illuminance, while a road authority may use a different assessment for traffic lanes. Record whether the requirement applies to new output or maintained output and which maintenance assumptions the model uses. Identify crossings and footways separately where the specification gives them different criteria. Make sure any acceptance table has one field for each required result. Suppliers can then show where a system meets the request, where it needs another design iteration and where the buyer still needs to make a decision.
For the selected head, request the photometric file for the optic and output used in the design. Have the report identify that file, the pole positions, aiming, road boundaries and operating setting. Read the calculation points as well as the summary. When a dark strip appears along one side, determine whether the outside row of calculation points belongs to the trafficked lane, verge or footway. Look for abrupt changes where the pole spacing varies or the road bends. A layout that gets one sample span right still needs checks at the exceptions.
If an offer only shows the reading directly beneath a lamp, ask the designer how the proposed arrangement behaves across the full road. If two layouts appear comparable, check how they model the road geometry, mounting angles and any lighting from other systems. A polished isolux image can hide those differences when the scale changes between reports. When an existing road is being upgraded, take a small set of site measurements under agreed conditions to understand the problem before selecting an optic. Ask the reviewer to carry the findings into the new layout and point plan.
Send the road section, pole spacing, overhang, mounting angle and the lighting criteria the consultant will apply. Ask for the IES or LDT for the actual 50 W option and identify the lens code on the calculation and the proposed purchase line.
Put the pole and civil assumptions beside the optical layout. Show which pole, arm and foundation drawing the optical model assumes. Mark changes to the overhang or mounting angle as they arise. Have the pole and electrical reviewers confirm the mounting and any earthing required before an approved lighting layout is used for a repeat order.
A wider throw or different optic can put more of the available light where the road needs it. Increasing full-output power at the same aim may brighten the strong points and use more energy while leaving the basic distribution problem. Ask to compare the candidates at the design locations, including any effect on glare and spill. Where a few pole positions cause the problem, test alternatives at those positions first. A shorter span or a different bracket can sometimes make more sense than changing every head. Record the preferred option with a clear explanation of what it improves.
An all-in-one head places the panel with the light. Show which direction the lamp needs to point and confirm the charging suitability of the panel at that installed angle. If an alternative optic lets the head sit in a better position, reassess the width and the relevant points in the calculation. If one side of the road is shaded by a stand of trees, identify the affected poles on the layout. An independent panel position may offer a better solution for those locations. Include its cable route and maintenance requirements in the comparison before choosing which arrangement to use.
Ask when the specified road level has to apply and whether the owner accepts a different level later in the night. Use the selected output setting in the lighting calculation for each mode claimed to meet a requirement. Verify that the controller can deliver the approved settings and ask how you will identify the mode during a night inspection. Where a sensor is used, agree the reduced level, the conditions for returning to the higher level and how long the higher level must be held. Check what people will experience at the change between modes.
Trace the night schedule into the energy design after the lighting settings are agreed. Give the supplier the actual nightly load by time block and the least favourable charging period. Ask for usable battery energy, charging assumptions and the mode the system will enter if the energy reserve falls. A battery and panel sized for a programme that dims early may deliver a different service from one sized for a longer busy period. If the owner needs a minimum late-night mode, treat it as a design input and preserve it in the commissioning record.
Use the fixture and optic identifiers when you approve the road sample. Ask for the corresponding review or test reference and use the same identifiers on any later batch. A lens change needs a new check of the affected road result.
Before installing repeated poles, choose a representative span and any special condition large enough to affect the design. Check the installed heights, aims, lamp references and operating mode against the approved records. Mark the measurement area and confirm when nearby lights are on. Use the owner’s accepted method to measure the relevant quantities and document conditions. This allows another crew to repeat the check when the aim is adjusted or the head is replaced. A phone image is useful for recording where you stood, while the agreed instruments and procedure give the result you can compare.
Where a span is bounded by poles at different heights or setbacks, identify the individual heights and positions in the model. Put the associated area on the inspection plan even if it sits between standard spans. If the point grid stops before the change, ask the reviewer whether the adjoining section needs its own check. That helps prevent a dark approach being missed when the owners first inspect the standard part of the route.
If the first check misses the required performance, identify the failure before changing equipment. A shifted pole can put the beam in a different place. A requested dimming mode may have been applied later than planned. A replacement optic may have arrived with a correct housing but a different label. Use the first assessment to compare the mounting, settings and equipment against the report. Make the approved correction on the trial span and record the final arrangement. Then share that information with the rest of the installation team while there is time to correct the repeated positions.
List the required lighting measure and uniformity for the route. Show each layout input with the IES identifier and fixture revision.
Ask where the lowest value occurs, including the far edge and between poles. If an alternate optic is offered, show which result improves and what power or mounting changes.
Ask the reviewer to name the positions and operating settings to use on the trial. Keep the approved grid and mounting data with the first-pole record.
Ask for one side-by-side sheet for the shortlisted optics. Keep pole height, lane width, spacing, overhang and tilt fixed. Show which grid values are average and minimum, and specify which uniformity formula the tender uses. If the offer gives one lux value under the pole, ask to see the point between poles before deciding whether to change the optic, wattage or layout.
When the job uses more than one optic, give each configuration its own packing reference and designated pole locations. Ask the receiving team to verify the fixture or carton mark against the lighting schedule before dispatching heads to crews.
Make agreement on the optic part of the order. Confirm the lens and fixture code before releasing the delivery date. Ask us to tie the warranty to that fixture code, including the battery and controller coverage, when the term starts and how you would request a replacement. Keep the lighting acceptance criteria in the same order so the optical review and a later warranty claim refer to the same equipment.
Put the retained pole locations in the new model. Check the centre and edges of the road between the highest-risk poles, such as wider gaps and bends. A change of optic or fixture can change which points need attention. Confirm whether the same area, metric and mode apply to the new requirement before approving the old spacing.
A few bright areas can raise the average while a separate part stays dark. Read the set of points, including the minimum, and compare the calculated pattern with the required coverage and ratio. Check the gap underneath the cables or midway between poles where the problem appears. Decide whether the issue requires distribution, location or output to change.
Ask for the exact photometric file used in the proposed report and for the matching luminaire, optic and output identifiers. If the kit changes before dispatch, ask which items and files are affected and have the lighting reviewer confirm the revised layout where needed. Keep the accepted file with the installation record so it can be reused if a light is replaced.
The answer depends on the construction and permitted adjustment for the selected integrated head. Ask for the actual installed orientation of the photovoltaic surface and the optic. If the positions that meet the road and charging needs conflict, compare the documented adjustments, another pole arrangement or a separated solar panel.
Send its width, the height to the emitting centre, setback, likely locations and arm dimensions if available. Mark bends, junctions and any facing properties. Add the owner’s criteria and schedule if known. A preliminary review can identify which missing input will most affect the choice and let you reserve space for a better pole position before drawings are fixed.
If the first value is average divided by minimum and the second is minimum divided by average, they describe the same ratio after rounding. Ask which convention the specification uses before comparing the results.
Use it to compare the layout only. For the proposed supply, match the exact model, lens, power and light output to the photometric file and run that profile on the agreed road grid.
Use the result across the span and the full width. A brighter spot can leave the minimum light unchanged. Evaluate the measure and uniformity required by the project brief.
Send the road section, pole positions, mounting and aiming details, lighting criteria and hours for each operating mode.