6 m All-in-One Solar Street Light

Find out whether your existing 6 m poles can take an integrated solar head. Check the arm and fittings, the road optic and the panel orientation before committing the whole route.

SL-ONE-DR hero product illustration
SL-ONE-DR integrated head and bracket.

Check if the new light fits your existing arm

Send a photo with the outside diameter and straight insertion length marked. Leave room behind the light for the battery drawer to come out.

SL-ONE-DR drawer product illustration
Series view

SL-ONE-DR · 40 W

2 LED modules · 50 Wp panel · 192 Wh nominal battery · Ø60 mm mounting interface

Check the existing arm and leave room to pull the battery drawer out with the head mounted.

Measure the existing arm in four places

Send first

Take a side photo and an end-on photo with a tape measure in view. Mark the outside tube diameter, the straight insertion length before the bend, the arm angle, and the distance to the nearest obstruction behind the light.

What to check

Compare those dimensions with the DR interface drawing and the battery removal path. Photograph corrosion or play in the arm separately so the contractor can decide whether to retain it.

Measure the existing arm before picking the replacement

When a 6 m retrofit keeps the original poles, group the arms that look alike and measure one from each group. Take a side-on photo of the straight portion and a close view of the arm end. For the 40 W DR reference, compare your measurements with the supplied interface drawing and check working room behind the head for the drawer.

MeasurementWhat it resolves
Outside diameter and usable straight lengthWhether the mounting sleeve can seat fully before the bend or obstruction.
Arm angle, approach direction and clearanceWhether the new light can aim at the road and clear the pole, wall or sign during service.
Corrosion, movement or undocumented repairsWhich poles need a separate condition and structural review before re-use.

Ask for a trial fitting on the least forgiving representative arm, such as the shortest straight section or tightest maintenance clearance. Record the fitting, aim and version of the bracket. Those records make it easier to identify which poles can take the same order and which need another configuration.

Other Sunlurio options to compare

SL-ONE-TJ luminaire and integrated solar panel

SL-ONE-TJ

For a retrofit order, send the arm measurements before comparing TJ. Confirm the part identifiers for any retained bracket.

SL-ONE-GM all-in-one solar street light for public area lighting projects

SL-ONE-GM

If the road edge sits behind an existing arm, ask whether a GM option can reach it at the retained bracket angle.

Sort the old poles before you choose a replacement

Walk the route with the installer and begin with representative poles from each visibly different group. The arm near a junction can look like the arms along the straight section until you put a ruler on it. One group may have a horizontal arm, another a tilted end, and an older repair may have left a reducer in place. Record dimensions and photographs against a pole ID. That lets the supplier confirm mounts by group and lets the contractor count any adapters separately. The approach also reveals isolated poles that are easier to replace than to treat as part of the retrofit.

Record what caused the replacement. An owner responding to dark spots may need different coverage. A maintenance team facing driver failures may want fewer separate parts. A developer restoring a route might need to preserve the foundations and finish the work around traffic. Write the reason against the existing pole record and locate areas where performance or access is already poor. Use the route survey to answer the replacement question and carry the existing lighting data into the new layout. The retained hardware can be useful even if the old head’s power and beam are a poor reference for the new light.

Pass an actual arm fit before repeating the 6 m retrofit

The diameter on an old pole schedule may describe the supporting arm, while the shorter end spigot carries the fitting. In a historical retrofit review, the drawing showed both a 60 mm arm and a 42 mm end. We ask which surface the new fixture will actually seat on.

CheckWhat to agree or verify
At surveyPut a scale at the end spigot. Record outside diameter, unobstructed insertion length and whether the sleeve would hit a bend before it fully seats.
At the sampleMatch the fit to the offered sleeve or approved adapter. Confirm the tightening points, rotation restraint and the actual lamp aim on a representative arm.
Before releasing the batchIdentify the approved arm group on the order. Hold any unmatched group for a separate trial, and ask the project engineer to review pole loads if the fitting weight or projection changes.

Make the two pole dimensions explicit

A 6 m pole on a civil schedule can mean a shaft dimension, while the light designer works from the height of the light-emitting centre above the finished surface. The top of a base and the nearest pavement may sit at different levels. The lamp arm can raise, lower or offset the position of the light. Ask the surveyor to record the relevant levels and the bracket height at representative poles. Mark the light centre and arm outreach together on the sketch. Use the surveyed light centre in the lighting model and the actual fixing position in the installation drawing.

Also photograph the path below the arm and the direction the lamp faces. When poles are retained, the existing locations and offsets are fixed inputs to the first design. Take a tape estimate of edge setback and identify widening sections, entrances and bends. Some improvements can come from fitting a better-suited optic or correcting a worn mount that had allowed tilt. In other locations, the retained pole may simply be too far from the surface to do the job on its own. Test the known positions in the model before committing all positions to the same equipment.

Rows of curved lighting pole arms in the workshop
Pole arms awaiting the next production step.

Measure the interface that actually carries the head

Measure the outside diameter, available straight length and usable insertion depth of the fitting. Note whether it is vertical or horizontal and whether it is tapered, bent or obstructed. Photograph the top and underside, fastener positions and any old sleeve or cable gland. A number stamped on a legacy fitting can describe a nominal size rather than the part the new clamp has to hold. Give those actual measurements to the supplier and request the exact installation drawing for the selected head, including the mounting orientation, fasteners and required clearance to set the aim.

Check where the new head will sit when the installer loosens it for aiming or needs to open it for service. A housing may clear the pole in its final position yet collide with an adjacent arm or canopy during installation. A drawn sleeve can fit the measured diameter yet leave too little engagement beyond an old weld bead or reducer. If a different mounting kit is proposed, include it in the equipment list and mark which group gets it. Have the qualified project reviewer check the proposed fitting and existing structure for the actual installation conditions.

SL-AIO-HC high-configuration all-in-one solar street light
SL-AIO-HC underside and mounting interface.

Put the four old-arm measurements on one drawing

Take the outside diameter and usable straight length at the lamp end, then record the arm angle and the clearance behind the light. Use them to review the sleeve and the path required to pull out the DR battery drawer after installation.

Include the condition of the pole in the retrofit survey. For a pole you plan to keep, photograph the base, service door and existing electrical connections as well as the arm. Have a qualified reviewer confirm the condition and any bonding requirements. A head that fits the arm can still need work at the pole or its base before the retrofit is safe to repeat.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Check where the road and the sun ask the head to point

A one-piece solar luminaire combines the panel and head. Ask the design team to show, for each recurring arm style, the optic direction needed for the road and the panel direction the chosen head will have at that setting. If the arm points away from the appropriate direction, check how the approved joint can compensate. Review fit, adjustment limits and service access together. What matters is the installed position at the pole, including the bracket, the road direction and obstacles nearby. Avoid approving a head only from a product photo of a fitting on a perfectly straight mount.

Look for a short run of suspect positions before you size the whole batch. Tall trees on one side of the road can shade the same lamp orientation for several hours. A line of buildings may shade only the first few poles. Ask for an input that reflects the least favourable operating period and give the installer photographs identifying those locations. A larger all-in-one head is worth comparing only if the old poles can carry and fit it and the panel can use enough sun. For the small group that fails these conditions, compare a split arrangement before redesigning otherwise usable positions.

Keep the lighting acceptance separate from the energy check

In the lighting review use road width, spacing, setback, pavement use and the required values at the actual positions. Give the designer an exact luminaire and photometric file to use, along with the intended aim. Ask a reviewer to identify the dark areas between poles and at geometric changes, and to show how the layout treats crossings or the end of the route. Night photos from old installations usually change exposure from frame to frame. Use them to identify where the problem occurs and use the agreed design and measurement method to evaluate the proposed remedy.

For the energy review, list full-output hours, reduced-output hours and any sensor periods. Confirm how the lamp behaves when the battery is low and how to verify that behaviour during commissioning. A fittings proposal that meets the light requirement early in the night still needs enough usable energy for the agreed later service. Have the supplier show the nightly load and the charging basis for that exact arrangement. If the programme can be changed during difficult weeks, ask the owner which lighting hours or locations have priority and record the agreed policy with the controller settings.

Verify the smallest clearance on the first fitting

Select the retained arm with the tightest representative clearance. Ask for the actual mount, fasteners and any adaptor on the trial kit, then inspect their fit and the battery removal path. Record the approved parts under that arm group.

LED module optics and wiring assembly workshop for outdoor lighting manufacturing
LED-module, optics and wiring assembly.

Test one representative fitting before ordering the route

Choose the hardest common location. A pole with an ordinary arm, straightforward daylight and unlimited maintenance access may teach very little about the rest of the site. If a common group includes a restricted pole near a building or an angled arm with limited clearance, include that condition in the first fit check. Ask the installer to document how the mount seats, what remains adjustable and whether tools reach the fasteners. Give the lighting reviewer a chance to compare the working aim with the proposed plan before the crew repeats the assembly.

If several old fittings are already available in the workshop, ask the installer to identify each one with its road section. Keep a measured example or drawing of each recurring interface so replacement mounts can be checked before they are sent to site.

Before a batch is released, match each pole group, head and mount against the approved equipment schedule. Record the battery and controller version or replacement references that the installer needs after handover. When the equipment arrives, measure the supplied interface against the approved drawing at the first installation and spot-check each group rather than opening an arbitrary box. Keep a short record of exceptions, including poles that were replaced or moved. Give the maintenance team the final records that will help them refit a head later without having to repeat the site survey.

Incoming material inspection of solar street light components with digital caliper measurement in a lighting factory workshop
Incoming inspection of a lighting component.

Keep the fittings tied to each retained pole group

List the pole groups

Use one line per arm profile or condition. List separately which poles keep their brackets, need an approved adaptor, or need an engineering review.

Ask for a marked-up interface drawing

Put the sleeve, engagement length, fasteners and drawer clearance on the same drawing. If a retaining strap or other fixing is required, list its points and parts in the quote.

Trial the tightest location

Check the real bracket and battery removal on the shortest usable arm or most restricted service position. Keep the approved parts and photos with the group reference.

Keep the retrofit sample tied to the parts that will ship

When a trial light fits but the bulk delivery does not, the buyer often has no record of the bracket or fasteners that came with the trial. Keep one signed fitting record per arm group with the measured outside diameter, bracket code, stop position and photographs. Include that record in the order so a substitute mount can be assessed before packing.

Use the diameter where the sleeve actually seats

We measure the straight part of a retained arm where the fixture will sit. A drawing can give a nominal pole-top diameter while the real arm ends in a smaller spigot or a short taper. Record the diameter, usable depth, clearance and the point that stops the fixture from turning.

A single-arm reference drawing separates the upper connection from the base plate and anchor details. Treat those as separate approval checks. An adapter that fits the upper connection does not establish that the existing pole and foundation can take a different fixture or mounting offset.

Send a photo with a scale at the insertion point and a second showing the arm from the side. Trial-fit the selected sleeve on one pole in each arm group before ordering the rest.

Label retrofit fittings by arm group

Have the packing list distinguish head-only replacements, adaptors and spare fittings. Mark each group so the crew fits the right hardware to the old poles and can set aside any damaged or unverified arms for review.

Keep old-pole work separate from the new light. List the replacement head and agreed adapter against each arm group. Ask us to show which items are covered and when the warranty starts. Put work on retained poles and the cost of a crew returning to site on their own lines, so there is a clear owner if a head has to come off after installation.

LED street light packaging line with carton marks packing photos and shipment preparation
Carton marking and packing preparation.

Retrofit questions worth settling

Share the condition, head and bracket geometry, and any available records with the project’s structural reviewer. A weight comparison is one input. An integrated panel can present a different area and position to the wind, and the new fitting may apply load in a different way. Keep the approved reuse assessment with the matching equipment and drawing before installing the revised head.

An available fitting adjustment can help match the photometry to the road when the optic suits the pole position. Confirm the usable range on the approved fitting. Then check the lighting calculation at that aim and revisit the panel orientation. Where the two requirements pull in different directions or the road is outside the useful beam, compare a different optic, mounting position or split configuration.

Group the poles by measured fitting dimensions and mounting direction first. Ask the supplier to confirm the approved kit for each group, including the proposed fasteners and engagement. Identify any position that needs a special check or a new pole. The item count can then be issued by group and marked clearly enough for installers to pick the right package at the worksite.

Before leaving allowance for an additional panel, confirm the controller input limits, the compatible panel and connection arrangement, and the effect on charging and mounting. The old pole also needs to be reviewed with the additional panel and bracket installed. An owner who expects the option should raise it before settling on an integrated design or choosing a split alternative.

Send representative interface photos with measurements, the pole and arm grouping, route width and spacing, and photos of shadow around the difficult poles. State why you are replacing the equipment and the expected night hours. Include the old drawing and any changes already made to the site. That is usually enough to decide whether a fitting check, lighting calculation or survey update should come first.

Compare carton marks and part codes with the approved pole groups. Keep the approved adapter and fastening set at site for a dry fit before issuing the rest of the cartons.

Record the pole location, measured interface, approved kit code and any changes to light height or tilt. Recheck the affected part of the lighting layout if the mounting position changes.

Check the approved adapter, engagement length, fasteners and resulting head position as an assembly. Refer damaged or poorly documented poles for a condition review before specifying retrofit hardware.

Check My Existing Pole Fit

Send the site, road dimensions and night schedule, plus photographs and dimensions for each pole arm group.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.