5 m All-in-One Solar Street Light

Plan a low-mounted solar light for residential entrances and paths. Check where people will see the lamp, where the light needs to fall and whether the integrated panel can charge from the same position.

SL-ONE-DR drawer product illustration
SL-ONE-DR series view with the removable battery drawer.

Choose a light for the entrance or path

Share the distance from the pole to the turn or gate, and flag any nearby windows. We can check where the beam needs to land before you choose between output levels.

SL-ONE-DR drawer product illustration
Series view

SL-ONE-DR · 40 W

2 LED modules · 50 Wp panel · 192 Wh nominal battery · Ø60 mm mounting interface

The 192 Wh nominal battery is below the 210 Wh drawn by the example schedule, even before losses. For those hours, review a lower verified input schedule or ask for a configuration with more usable storage and a matching panel.

What to send for an entrance lighting check

Send first

A phone photo looking into the gate, the distance to the turn, the nearest window, and the hours when people still use the entrance. A rough sketch is enough to start.

What to check

Ask for a head and optic that put light on the crossing. Confirm the input at each dimming step and the usable battery energy for those hours before you choose a kit.

Check a 5 m entrance after the evening rush

For a small estate gate or driveway crossing, compare where the light lands at the turning point and where it reaches the nearest bedroom. A 30 W head is a reasonable simulation starting point for this example. The 40 W DR on this page is a separate Sunlurio candidate with its own specification. Ask for both optics to be compared at the proposed height and aim before choosing the input power.

Time or taskIllustrative settingWhat to check
Evening arrival30 W for 4 hoursCan drivers see a pedestrian approaching the gate?
Quiet hours15 W for 6 hoursKeep the crossing legible while limiting light toward windows.
Nightly load210 Wh on the stated scheduleUse the actual fixture input at each step for battery and panel sizing.

This worked schedule uses 210 Wh at the light input. A battery with a nominal rating of 192 Wh cannot cover it without another energy source. Check usable storage and expected charging after dimming or equipment changes. Compare the two head options against the retained night level and the least-sunny month. A picture taken from the driver’s seat and a second one from the nearest window give the lighting designer two useful viewpoints.

Other Sunlurio options to compare

SL-ONE-TJ luminaire and integrated solar panel

SL-ONE-TJ

For several gates with the same arm, ask which TJ variant can carry one approved lens and mounting kit across the order.

SL-ONE-GM all-in-one solar street light for public area lighting projects

SL-ONE-GM

If the pedestrian gate sits off the driveway centreline, ask to see the GM beam on both paths before choosing a variant.

Place the light where people walk

At a residential entrance, look at the gate, the first bend and the place where pedestrians cross the driveway. A bright patch directly below the pole can leave all three poorly lit. Start by marking the pavement that actually needs light and the windows that need protection. Ask for a layout with a pole at the intended location and the proposed luminaire aimed as it will be in service. When the path runs beside a wall, check both the useful light on the pavement and the spill towards the wall. A 5 m mounting height gives you a useful starting point for that review.

Use the light-emitting centre as the reference for the lighting calculation and write down how it relates to finished ground. On a sloping site, identify which level the drawing uses. If the civil drawing calls up a 5 m pole, check whether it includes any portion set below grade and how far the luminaire sits above or below its fixing point. Ask the installer to identify the difference before ordering. A small change can shift where the light falls, and a change to the mounting arrangement can also affect the view of the lamp from nearby rooms.

Walk the site at eye level

Stand at the gate and look along the approach in both directions. Do the same from the first occupied window and from the point where a driver turns in. On the layout, mark the directions from which people can see the light source. Ask the designer to assess the near approach and properties on the far side of the road as well as the path itself. A forward-throw optic can push useful light past a verge, yet still produce an uncomfortable view if the lamp is tilted sharply towards the viewer. Use fixture position, optical choice and aiming together to solve the problem.

Photographs from a phone are particularly useful before a layout exists. Take a wide view from each proposed pole location, a view from the path looking towards the pole and a view of the nearest windows. Indicate which exterior spaces must stay dark and where people need enough light to recognise a kerb or a change of level. If the site already has lights, include their locations so the design can show where light overlaps. Ask the owner whether the proposed lighting also has to work after existing lights are switched off. That decision affects which conditions belong in the calculation.

Check the solar panel and road optic together

An all-in-one head keeps the photovoltaic panel on the luminaire. That can simplify installation when the selected mounting position gives the panel a clear view of the sky and the optic can face the path at the same time. Ask for the actual aims shown on the mounting drawing. With this arrangement, changing the head direction to fix overspill can change the panel direction as well. Use the adjustment range shown for the proposed mount and ask which axes the installer can set independently. The adjustment must still allow the head to be secured and serviced at the final angle.

Take daylight photos that show trees, rooflines and adjacent buildings near the chosen pole position. Give the designer the site location and describe when foliage or buildings cast shade, especially in the least sunny operating period. If the pole sits under a canopy, moving the pole within the same verge may expose the panel while keeping the pedestrian surface in the light. Compare that move with the cost and disturbance of relocating the foundation. Where the light must stay in shade but the panel can sit elsewhere, review a split system with independently mounted components.

Rows of LED modules on an open luminaire assembly at a workbench
LED modules on the assembly bench.

Check the entrance from both sides of the gate

Give us a photo from the driveway approach and another from the nearest pedestrian entrance or window. These two views help set the beam and aiming limits before the trial. Compare the light at the turn and the crossing, then confirm the input at the agreed night settings.

Show who handles the pole and electrical work. If the entrance already has a metal pole, include the existing electrical equipment and site earthing arrangements in the photos. Have the site electrician identify any bonding required for the final assembly and local rules. Put reused poles and new hardware on separate lines so the customer knows which checks belong to the site team.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Set the lighting hours before comparing batteries

Give each operating period an actual lighting task. The entrance may need a clear view at closing time, while the footpath may only need an agreed reduced level later. Confirm how long each period lasts, what power the light draws in that mode and when a sensor, if supplied, overrides the schedule. As a worked example, a load drawing 25 W for four hours and 10 W for six hours uses 160 Wh at the load before controller losses. That calculation explains the schedule you are comparing. Actual settings and output come from the selected luminaire, controller and project lighting plan.

Ask how much battery energy the selected system can use in the required temperature range and how quickly it can recover after the design period of weak charging. The two questions need separate answers. Extra usable storage can carry the same load for longer, while the solar panel still has to replace the energy during the available charging hours. Agree how many consecutive nights need to be covered and decide what can be dimmed during recovery. When comparing proposals, have both suppliers use the same operating schedule and season so that the answer describes the same service.

Give the installer a usable drawing

Send photos of the pole top or arm with a measurement reference and identify anything that restricts rotation. Ask for a drawing showing the fitting, insertion depth, fasteners and any restrictions on mounting orientation. If the light replaces an old head, record the arm angle and the location of existing cable entries. Inspect the pole and confirm its suitability for the proposed head and site conditions with the responsible reviewer. Even when the sleeve fits, the wider housing can meet a wall, bracket or tree during installation or when it is opened for service.

Agree which parts the supply includes. A head-only package and a package with a pole, foundation hardware and commissioning may both be offered against the same site description. The approved schedule should identify the supplied luminaire, battery and controller arrangement, mounting pieces, quantity and the parts that will be sourced locally. Ask how the battery and mounting hardware can be replaced later and whether the replacement is accessed from the same side as the working platform. If the approach is narrow, decide with the installer how to reach the fasteners without blocking the entrance longer than the site can accept.

SL-ONE-DR drawer product illustration
SL-ONE-DR battery drawer and housing.

Check the lens and battery drawer on the trial unit

Ask for the optic and mounting parts used on the entrance sample to be listed with the model. At inspection, confirm the bracket can hold the intended aim and that the installer can remove the battery drawer from the planned service side.

LED street light final assembly line with luminaires prepared for project orders
Luminaire assembly and finished-product preparation.

Give the night inspection a clear purpose

Start with one representative pole if the entrance layout repeats. Compare the fixture label, optic and operating profile with the approved offer before assessing the light. After dark, walk the route from both ends and watch the transition from the gate to the driveway or pavement. Assess the window side as well as the ground below the pole. If the owner has set numerical limits, use agreed measurement positions and the relevant time or lighting mode. Record housing aim, adjacent light sources, the time and the operating mode so that someone can repeat the check after an adjustment.

At a property entrance, bring the person who uses the gate after dark into the first walk. They can point out a keypad that becomes hard to read, a blind edge next to parked vehicles or a window that looks directly at the head. Mark that spot for the designer and check it at the hours when the problem actually matters.

At delivery, count mounting kits with the luminaires and identify any differences by location. Save the approved version of the settings and mark the fixtures that use a different profile. Give the maintenance team the equipment reference and access procedure before the site closes out. If the first installation exposes an aiming or access problem, resolve it on that pole and record the corrected setting before the repeated positions are installed. Use the same checks where the site has an exception, such as a pole higher above a downhill path or beside a window at a different level.

Sunlurio goniophotometer photometric testing lab for street lighting IES and LDT review
Photometry equipment used to prepare luminaire distribution files.

Approve one entrance before buying for the rest

Compare the same work

Count gate lights, path lights and poles separately. Ask the supplier to list the light, bracket and fixings and identify any work needed on the existing pole.

Keep the schedule with the selected light

Ask for the fixture code, optic, panel rating, battery data and controller schedule on one configuration sheet. Confirm an energy budget for the actual hours.

Walk it after dark

Check the view from the driver’s seat, the pedestrian crossing and the nearest window. Agree the early-evening and quiet-hour settings before repeating the layout.

Set the quiet-hours lighting level before you choose the head

A housing compound can have a busy entrance and a mostly empty path on the same circuit. Write down which area must stay lit after closing and which can dim. If a motion mode is proposed, ask for its standby wattage, triggered wattage and hold time. Then check the effect on the bedroom-facing side of the path. Choose the optic and standby level before comparing larger heads.

Keep the fittings with the right entrance-light cartons

If the property has more than one entrance layout, match the cartons and fitting bags to each location on the order. Check the sleeves, fasteners and spare parts separately when the delivery arrives.

Before you order for the other entrances. Match the quote to the entrance you approved after dark. Ask us to show the delivery window for the rest of the gates and the written warranty for the complete head and battery. Confirm when coverage starts and who handles a return or a callout, so your site team knows what to do if one entrance goes dark.

LED street light packaging line with carton marks packing photos and shipment preparation
Carton marking and packing preparation.

Questions to settle before you choose

Ask for both areas on one lighting layout. The useful decision comes from seeing the light at the gate, the vehicle turning point and the first piece of pavement where they overlap. If the two tasks conflict, compare an alternate pole position or a second light. At a narrow entrance, a different optic may solve the fan of light on the pavement while avoiding the cost of another civil position.

Collect the existing wattage, mounting height and optic if you can, then state what works and what you want to improve. For example, an old lamp may use more power while lighting the garden wall better than the pavement. Compare the proposed photometric file and lighting calculation against the area you need to see. The solar load should then follow the proposed electrical draw and schedule.

Include the window height and viewing direction in the brief. A ground-level walk cannot represent that view. Ask for relevant spill checks at the window and review whether a different aiming angle, optic or position helps. If an accessory is proposed to control spill, include it in the configuration and review its effect on the useful light.

Consider it when the usable light position is shaded or when a separate panel position allows the layout to keep the intended orientation. Show both potential mounting points and how they could be connected. Compare the battery and cable access costs as well as the ability to capture sun. The comparison is easiest before the foundation and cable route are fixed.

Start with a marked plan or aerial view, the location, photos in both directions, any existing poles and your night operating hours. Add details of the surfaces and windows that matter. A sketch with measurements often gives enough information to decide which layout is worth calculating first and which questions to take back to the installer.

Only if the site owner accepts the untriggered lighting level. Test whether a pedestrian at the entrance receives enough light before reaching the kerb, and record the agreed night settings.

Ask for actual input power at full output, the exact optic and the rated luminaire light output under that condition. Compare the results at the gate and driveway using the same layout and operating mode.

Map the gate, path and any blind corner as separate lighting tasks. If the gate needs sustained output while the path can step down, specify separate schedules or circuits before ordering.

Review My Entrance Layout

Tell us where the light goes, the height to the light centre, the nearest windows, shading and your night schedule.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.