Check the bolts against the pole base plate before you order
Send your pole base plate and foundation drawings. Sunlurio can help you check the anchor spacing, thread and projection, and list the bolts, nuts, washers and setting template on the quote. For a replacement, a clear base photo and the measurements you already have are a good place to start.
Pattern
Bolt circle or dimensioned bolt coordinates, quantity, orientation and base plate holes
Rod and thread
Material, diameter, thread, rod form, embedment, projection and finish per approved details
Matching hardware
Nuts, washers and template quantity as specified on the assembly schedule
Document coordination
Pole mark, order quantity, foundation drawing, base plate drawing and revision
Ask for a list that identifies the bolts or rods, nuts, washers and the template where required by the drawing. If the contract calls for a cage assembly, describe the other members and their connections on its drawing. Confirm whether the template is delivered with every anchor group, shared between installation locations or supplied in a separately agreed quantity. Distinguish the template used to position anchors from the pole’s structural base plate. Site crews need to know which parts are permanent, which are installation aids, and which may be removed only if the approved method says so.
Ask the supplier to identify the quantity per pole and the quantity per shipment. Include matching nuts and washers in the same schedule and agree how the hardware will be bagged and labelled. Where the project has different pole families, assign an item mark to each bolt group. A drawing register and packing list that use the same identifiers make mixed shipments easier to inspect. Make the approved hardware list available to the civil team before foundations are prepared.
Look at which foundations will be formed at the same time. If the template can be removed and reused under the approved construction sequence, count the locations each crew needs to set out in parallel. If the project detail leaves a plate in the foundation, include it with each applicable bolt group. For mixed pole bases, use a separate template mark for each hole pattern. Tell us how many crews or simultaneous foundations you expect, and we can help you write the parts list.
A project buyer once found M19 in one order document and M20 in another. The buyer needed to know which rod the pole and foundation drawings called for before buying hardware. Even a small difference can change which nuts fit or whether the rods pass through the holes in the base plate.
Send both drawings and the bolt line from the quote. We can flag discrepancies in hole centres, bolt diameter, thread, projection above the finished concrete and orientation. The project engineer can then resolve the difference on one drawing revision before the hardware is released. Give that same revision to the team setting the template so they can check the layout before the pour. Use our drawings and datasheets checklist to see what to send for review.
For a circular layout, check the bolt circle diameter, number of bolts and angular arrangement. Bolt circle diameter describes the circle through the bolt centres. It is a different dimension from overall base plate diameter and individual hole diameter. For square or rectangular layouts, use the specified centre-to-centre dimensions or coordinates in both directions. Review any offset, irregular pattern or slotted holes against the marked drawing. Ask which drawing direction corresponds to the road, arm and access door so the assembled pole can face the intended way.
The anchor spacing must be assessed together with the actual holes, construction tolerances and concrete design. Before concrete placement, the site should reference the approved drawing and check the template and bolt pattern against the pole base plate or the verified inspection dimensions. If the drawings show different revisions, ask which revision governs each interface and record the answer. For a change to the hole pattern or plate orientation, have the responsible engineer and affected supplier review the revised documents together.
Make the first check while all the parts are still easy to reach. Lay out the pole base plate reference, anchor group and template together, using the approved drawing revision for that location. This is the point to catch a rotated hole pattern or a thread that will take the wrong nut.
The pole base plate transfers forces to the foundation assembly. The setting template positions the anchors for installation. A drawing can show a thick base flange and a thinner template on the same sheet. Ask for a separate mark and quantity for each, especially if the site will keep the template and move it to the next pour.
For a circular group, check bolt-circle diameter and rotation. For a square or rectangular group, check centre-to-centre dimensions and diagonals. Give the surveyor the same reference direction shown on the pole drawing so the access door and arm will face as intended.
Trial-fit the specified nut and washer, then compare the proposed exposed thread with the approved finished level and the assembled base connection. Record the units and thread designation on the order. If a dimension is hard to measure after the concrete sets, agree a way to check it before pouring.
Assign a pole or foundation mark, drawing revision and anchor assembly reference to each location. Keep the first-fit check and a photo in the handover file where the project requires it. If a replacement is needed later, the maintenance crew can use that record to identify the assembly and decide what still needs measuring on site.
If you only have a photo or an old drawing, send it with any measured dimensions. We can help list the missing information for the civil engineer and match the quote to the hardware you actually need.
Use this checklist with the approved drawings, the actual base plate and the setting template. Record the checks for each foundation position.
Record the pole mark, drawing numbers and revisions. Confirm thread size, nuts and washers against the approved parts list. Have the site team confirm the required embedment and thread projection as separate entries.
Record centre distances in both directions and the diagonals where applicable. For a circular pattern, confirm the pitch-circle diameter and orientation from the drawing. Trial-fit the actual plate or an approved gauge and record which side faces the road.
Record the thread projection from the drawing datum and photograph the template during the fit check. If the fit, dimension or orientation differs from the approved drawing, pause placement at that position and have the responsible project engineer clear the discrepancy.
Start at the finished concrete level shown on the foundation drawing. Above that line, check the space needed for grout, the base plate, washers and nuts, including the thread engagement specified on the drawing. Below it, use the embedment and anchoring detail approved by the project engineer. If you are measuring an existing base, show the measurement from the concrete and let us know whether you can see the grout line. This helps us compare your photo and the drawing from the same reference level.
On one pole drawing, the permanent base plate was 20 mm thick and the temporary setting plate was 4 mm. The two dimensions described different parts. If you see two plate thicknesses, send the plan and section views. We can help identify which plate each dimension describes and check that the setting pattern matches the pole base. If a thread is damaged or an anchor has moved, record the position and take a close photo for the engineer before any site modification.
Open the full-size anchor pattern drawing to read the reference dimensions. Confirm bolt centres, orientation and exposed thread against your project drawing.
The civil and structural design determines whether the anchor group is suitable for its loads, concrete and foundation geometry. Relevant inputs include wind and equipment loading, concrete properties, edge distances and the specified design basis. A standard example can help a buyer recognize the parts of an assembly. Use the project calculation and approved drawings for dimensions, capacity and installation details. For existing foundations, the assessment also relies on condition, original records where available and suitable site measurements.
Check which drawings are supplied by the pole manufacturer and which must come from the local civil engineer. Ask the buyer to identify the drawing revision used by each team. Before ordering, look for common interface information such as the base plate pattern, orientation and site level reference. This is especially useful when anchors are bought locally but poles are being delivered from another supplier. Agree who resolves a discrepancy before the concrete work or production proceeds.
For incoming inspection, compare the item mark, count, threads and dimensions against the order and drawings. Ask whether material and finish records are required for the contract, and how batches will be identified. Keep the assembly protected until the site team can check it against the intended installation location. Before concrete is placed, the site team should follow its approved inspection plan for position, orientation and projection. After placement, record the actual condition and report deviations. Final tightening and connection acceptance follow the approved project procedure.
A public Burkina Faso road lighting reference lists pole and anchor-bolt quantities as separate supply lines. The foundation guide also includes reference diagrams that explain what needs to coordinate with the base plate. Use those resources to understand the purchasing and drawing relationship. When you request a quote, state the pole mark, document revision, number of sets, destination and whether you also need templates or associated hardware. If you only have a base plate sketch, indicate what the civil engineer still needs to confirm.
When a site needs replacement hardware, start with the location and the pole mark. Photograph the installed base from more than one direction and mark the scale or supply a measured sketch. Record which dimensions were measured in the field and which come from the original documents. The exposed part may be accessible, while information about the concealed portion may require the original foundation record. A bolt can look similar to a spare held in the store and still have a different thread or embedded geometry. Ask the site engineer which reference can be used for the proposed replacement.
If the project has more than one base plate type, supply separate sketches or drawings for each condition. A common schedule can show the base plate mark, anchor mark, drawing revision and number of locations. Include a note whenever an existing condition differs from the approved record. That gives the reviewer enough information to decide which lots can use the same hardware and which should be assessed separately. Confirm who will verify the installed foundation and the final assembly before work proceeds. If you are preparing a tender, use the BOQ and tender documents checklist to keep the hardware schedule aligned with the drawings.
A coastal project buyer once found different stainless-steel grades in the correspondence and quote. If the project calls for 316 stainless steel, put that grade next to the anchor item on your enquiry and ask for the material record required by the contract. Send how many pole locations you have, rods per base, and whether to include nuts, washers and a setting template. We can list these separately and match them to the pole mark and drawing revision. For a reusable template, tell us the number of crews or foundations planned for each pour so we can review the quantity with you.
Ask for the current foundation and base plate drawings before the hardware is released. On the purchase schedule, identify the specific versions used to order and inspect the assembly. If procurement is split across parties, give the civil contractor and pole supplier the same interface schedule. An open question about the template orientation can otherwise surface after fabrication or when concrete has already been placed. The delivery record should allow site staff to check the identified assembly against the location schedule and set aside any item whose marking differs. For staged construction, keep track of templates issued to different crews and match the final count to the concrete work sequence.
Use diameter as the starting identifier and provide the thread, layout, length, projection, material, finish and hardware requirements. Two anchor sets with the same diameter can serve different base plates and concrete designs. A revised drawing and quantity will make the enquiry easier to scope.
Record the measured centres, orientation, thread condition and plate geometry. Compare them with the approved drawings and refer the discrepancy to the responsible engineer before modifying the assembly. Keep the measured condition with the drawing revision so everyone reviews the same issue.
The quantity depends on the order and the site sequence. Confirm the number of templates and whether the site intends to reuse them. Show the count on the quotation and packing list independently of the number of foundation assemblies.
Review it under the approved mast and foundation design. A high mast may introduce different loads, flange geometry and installation requirements. Ask for the anchor drawing that corresponds to the selected mast and use that reference for the civil review and hardware quotation.
Measure centre to centre in both directions and record both diagonals. Take an overhead photo with a ruler or tape and mark which side faces the road or access door. If the plate has slots, show the slot length and direction. We can compare the measurements with the base drawing and flag any difference for the project engineer.
Photograph the base and measure the visible thread, projection and spacing. Ask the site team for the as-built foundation drawing or inspection record so the engineer can review the embedded length and concrete condition. Treat the visible measurements as a fit check and get the foundation reuse decision before releasing the replacement pole.
Hold installation at the affected location. Measure the projection from the finished concrete and record the grout gap, plate thickness, washers and both the specified and actual nut engagement. Send a close photo and the drawing revision to the connection engineer so the team can agree a correction before tightening or changing hardware.
Start with the grade and corrosion protection specified for that project. If the drawing calls for 316 stainless steel, include it on the bolt line and identify the required material record. For any proposed change, ask the project engineer to review the anchor, nuts and washers as a set with the required strength and corrosion protection. Use the approved grade on the order and receiving checklist.
Send the base plate and foundation drawings with the number of pole locations. For replacement hardware, start with a base photo, visible thread and measured bolt centres. Add the files in the email if available.