8 m All-in-One Solar Street Light

Compare the road optics and panel orientation for an 8 m integrated solar light. Reconcile the required night readings with the actual installed geometry before choosing a head.

SL-ONE-DR four product illustration
SL-ONE-DR 60 W with four LED modules. See the AF option below.

Compare DR and AF on the same road

Use the same pole spacing and aiming angle for DR and AF. Compare the light on the road, then check how the crew will reach the battery and how the light charges in local temperatures.

SL-ONE-DR four product illustration

SL-ONE-DR · 60 W

4 LED modules · 100 Wp panel · 576 Wh nominal battery · Ø60 mm mounting interface

Compare the four-module head on the actual road grid.

Put DR and AF into the same 8 m comparison

Send first

Send the road width, spacing, aiming angle, site temperatures and method of reaching the light for maintenance. Say which option you were offered if a supplier has already quoted AF.

What to check

Start with the 60 W DR reference. Ask for the specific AF variant, input power and optic before comparing. Compare both on the same road and under the same operating hours.

Use one 8 m road layout for the DR and AF comparison

A useful comparison controls the pole positions and road conditions. Start with the 60 W DR and ask for the specific AF option you would receive. Give both suppliers or designs the same lane width, traffic conflict points and aiming limits. Compare road performance and service access as independent decisions.

Comparison itemKeep the sameAsk the supplier to show
Road calculationRoad width, spacing, arm projection and aiming conditionsActual optic, IES and results across the calculation grid.
Service arrangementAccess side and equipment used to service the poleBattery removal route and the replaceable part reference.
Charging conditionsSite shade, mounting direction and temperature assumptionsPermitted charging range, charging behaviour and the intended night schedule.

Choose the fixture that meets the road criteria and can be maintained by the crew available to the project. If someone proposes a larger head, ask which result the change improves and which mounting and energy checks then need revision.

Other Sunlurio options to compare

SL-ONE-AF luminaire front and solar panel rear views

SL-ONE-AF

AF1 for hot sites · AF2 with optional battery insulation for cold sites

For a road serviced from one side, compare access to the AF battery with the DR removal path and confirm the actual option offered.

SL-ONE-TJ luminaire and integrated solar panel

SL-ONE-TJ

If multiple depots will receive the lights, ask which TJ variant can use one defined optic and parts list at this mounting height.

SL-ONE-GM all-in-one solar street light for public area lighting projects

SL-ONE-GM

If the outside lane remains weak in the DR and AF comparison, add a specific GM optic to the same 8 m calculation.

Begin with the light position above the finished road

When the project already calls for an 8 m light, find out how that dimension was taken. It may describe the shaft, the top of the bracket or the centre of the light above finished ground. Ask for a road cross-section and one side view of the installed pole. Mark which direction the bracket points and how far it reaches over the verge. Use those dimensions in the lighting work. If the civil drawing shows a future resurfacing level or a slope to the carriageway, agree the ground reference before comparing the positions in the model.

Mark out the sections that one calculation needs to represent. A straight section with even spacing can be the base case. Add a bend, junction, uneven spacing or a different setback when it changes where the light has to reach. Show where people cross and which parts of the road need to stay outside the assessment area. If one line of poles has been set close to a tree belt, identify those pole IDs before the head and panel arrangement is chosen. Review the light and the solar exposure for the same installed location.

Clear up the 4 m reading before treating it as an 8 m requirement

One historical specification we reviewed asked for 24 lx in high mode and 12 lx in low mode at a point 4 m below the light. It also called for an 8 m installed height. Those were different conditions in the brief. The figures are helpful for identifying what the owner needs to clarify. Ask which reading is a bench or sample check, which height applies to the road, and whether the road acceptance is based on the lowest, average or another required value across an agreed set of points. Put the answers next to the criteria on the calculation request.

A measurement directly below the lamp describes that location. Near a kerb, between poles or at the far side of the road, the amount of light depends on the beam and the geometry. A simple height-based scaling of the single reading cannot replace a calculation across the installation. If the original specification also mixes two values for lumens, ask which luminaire output the owner expects and which operating mode it describes. Get the project team to sign off the corrected height, positions, photometric file and mode together, so a later night test can reproduce the conditions that were approved.

Compare the aim of the optic and the aim of the panel

For an integrated light, the head carries the photovoltaic surface. Ask the supplier for the actual mounting and adjustment drawing and have both the road bearing and solar aspect marked on it. Check the installed azimuth and tilt of the head at the position used in the lighting report. A pole with a fixed arm may give less adjustment than the head has on a bench. If a product offers an articulated joint, confirm which angles and fixing arrangements apply to that exact model. Check for contact between the housing and the arm at the planned aim.

Compare a few layouts before deciding that the proposed pole dictates how the beam must be aimed. An optic with a different distribution can let the housing sit closer to level while reaching the intended pavement. A revised arm direction can free useful adjustment if the project still allows a change. Where the only workable beam position leaves the photovoltaic surface poorly exposed, compare a split system. Include its extra bracket, enclosure and cable work in that decision. Record the candidate installed configuration with the option, so that the designer and estimator are discussing the same package.

SL-ONE-AF luminaire front and solar panel rear views
SL-ONE-AF optic and photovoltaic surfaces.

Send a comparison sheet for the actual DR and AF versions

Keep the road layout and night schedule fixed. Identify the lens, head power, charging limits and service-side clearance for each offered version. Review the light distribution and energy figures against the same conditions.

Use one structural and electrical brief for both options. Give the site reviewer the same pole and arm details for DR and AF, including the mounting method, weight and install angle of each build. Capture the installer’s requirements for the base and any earthing before choosing a trial option. That avoids approving a road result for an arrangement the crew cannot install as drawn.

Engineer reviewing solar road lighting drawings and project document requirements
Engineering review of project drawings and document requirements.

Check the least favourable row of poles

Use site photographs taken towards the horizon on the solar side of the proposed pole, in addition to the plan. An obstacle can affect solar exposure even when it does not obstruct the roadway beam. A sign, building edge or nearby tree can shade some individual poles and leave the rest clear. The client can mark these examples with approximate hours and the season of the observation. Ask for a charging review that uses the expected conditions at those positions. A full day feeling bright to someone on the ground does not tell you how much energy reaches a panel at an 8 m position and its actual tilt.

Give the supplier the hours for each agreed lighting level and ask how the selected system recovers after weak charging. A light may meet the road requirement in the main operating period and use a lower late-night mode. Check the energy used in both modes and show which modes must be represented by the lighting report. Include how the battery and controls act when charging is limited, especially if the owner has set a minimum service that must be available late at night. Review those decisions with the people who set the site operating schedule before you approve the configuration.

Resolve bracket and access problems before repeat installation

Put the assembly drawing in front of the installer and the person responsible for the pole and foundation. It should show the head, mount and any adapter at their intended positions. Provide the selected equipment’s dimensions, weight and exposed geometry to the responsible reviewer. If the project carries a camera or sign on the same pole, show that attachment too. Review the site access point and where a platform can be placed so the crew can secure, aim and later service the light. A tight corridor beside a building or overhead obstruction is best identified before equipment is dispatched.

At the first suitable pole, record the actual aiming arrangement and compare it with the photometric model. Check the installed panel view of the sky and whether the housing can be opened as intended. Before the night inspection, confirm the actual mode and which other lights will be operating. Keep a record of the lighting check and any adjusted bracket locations, then share the revision with the crew. If an alternative fitting was needed on that pole, identify the locations that need it, rather than leaving the difference to be discovered on each installation.

Rows of curved lighting pole arms in the workshop
Pole arms awaiting the next production step.

Make the selected battery arrangement clear to inspection

Record the variant, battery access direction and control program before approving the sample. If one option uses a different enclosure or thermal arrangement, compare its actual part and mounting details during the check.

Battery power unit assembly and wiring check for solar lighting system matching
Battery-unit assembly and wiring.

Order a version the site team can recognise

On the equipment schedule, name the luminaire, optic, solar and battery arrangement, controller profile and mounting kit together. Ask for the photometric and assembly references revision by revision. If the spec allows one option for open positions and another for shaded or constrained positions, assign each version its pole numbers before packaging. Delivery inspection can then compare labels and fittings with the schedule and catch incorrect variants without opening every item. Keep the same references for any spares. A compatible housing can carry a different optic or controller profile, so write down what the spare has to match.

If an early calculation follows the wrong mounting height, preserve it as a record of the clarification and commission a revised calculation for the real site. When you send the revision to the buyer, identify the height, mounting orientation and lighting criteria that now apply. The installing contractor can check those three items against the latest drawings without needing to interpret both reports. If the owner still wants the original 4 m sample reading as a factory check, give it a separate place on the acceptance sheet and explain what it is used to verify.

For review or handover, request the data sheet, the applicable photometric file and calculation, the mounting drawing and instructions for identifying the scheduled run modes. Name the party who approves the project site inputs and the party who checks the equipment on arrival. The signed installation and settings record should show changes made during the trial. If the first batch is going into a different environment from the sample location, document that condition separately and verify that the approved lighting and charging assumptions still apply.

Lighting shipment cases and cardboard cartons staged on the workshop floor
Export cases staged before dispatch.

Ask each supplier to fill the same comparison lines

Light on the road

Get the fixture and lens code, matching IES and the points that govern the road result. Hold road geometry, tilt and lighting targets constant.

Battery and maintenance

Ask how the battery is reached and replaced from the local access position. Request charge limits and usable energy for the exact variant in the offer.

Record the choice

Keep the accepted lens and control program with the chosen variant. Ask the supplier to resubmit the affected evidence if the optic, battery or controller changes.

Tell the supplier which lighting result will be accepted

A tender can contain a point lux reading taken close to the lamp and a taller mounting height for the finished road. Put the factory check and the site acceptance grid on separate rows. For the road, state the light-emitting height, actual tilt and dimming stage. That lets buyers ask for a matching version of the luminaire and compare the exact lighting result they will accept.

Separate alternative configurations in packing records

If trial units include both DR and AF, ask for each kit to be identified by version. Keep its mount and applicable spare parts with the relevant carton reference so the field comparison can be traced back to the offer.

Check that the compared offer is what ships. Have the chosen DR or AF configuration written on the order with the agreed dispatch window. Ask us to list coverage for that exact build, including the lens, controller and battery as applicable. Compare how a replacement part gets to your maintenance crew, since two offers with the same nominal term can leave the buyer with different costs.

LED street light packaging line with carton marks packing photos and shipment preparation
Carton marking and packing preparation.

Common decisions at 8 m

The same valid file can represent the same exact luminaire and optic in separate calculations when its output and operation match the selected setup. The designer still needs to change the geometry and run the appropriate evaluation for each height, aim and layout. Ask to see which file reference and operating condition were used on the 8 m calculation.

It may move light towards the edge, but the designer should check the other evaluation points, glare and light outside the required area. Verify the bracket limits and the solar panel angle after the change. Sometimes a different optic serves the edge with a better balance than tilting the whole integrated housing.

Record both targets before selecting the mounting arrangement. Start with the surface the road light must serve and calculate the orientation available for the panel on that arrangement. Compare approved alternatives if the two conflict. An independent solar mount lets those decisions move separately, with additional structural and electrical details to review.

Use the final intended bracket when the sample needs to prove aiming, mechanical fit or service access. If an early sample uses another fitting, identify which tests still apply and plan a later check of the actual kit. Ask the installer to photograph both the final seating and the proposed working position for maintenance.

Send a cross-section, representative pole and arm sketch, spacing, edge setback and a marked layout of the difficult locations. Add which lighting modes and measurement method the owner expects. A few photos looking along the road and towards the sky on the panel side help the designer review the practical orientation at the same time.

Ask the designer to list the maintenance factor, the lighting stage and the conditions used for the grid. Keep those assumptions fixed if you compare two optics or plan a field acceptance check.

Ask for finished-luminaire results at the offered setting and for a matching IES or LDT. LED-chip and complete-luminaire measurements can describe different objects and test conditions.

Ask for the IES and calculation for the specific AF version. Compare the results on one road grid and keep each fixture code and optic with its result.

Review My 8 m Lighting Layout

Send the road geometry, lighting criteria, pole and arm layout, and photos showing shading near the worst positions.

PLANNING A SOLAR STREET LIGHTING PROJECT?

Share your project location, estimated quantity and requirements.
We’ll review the suitable configuration and supply scope for your project.