AC LED Flood Lights

Specify mains-powered flood lights for yards, industrial sites and sports areas. Start with the areas that must remain usable, then check beam direction, mounting, circuit protection and the exact fixture you will receive.

Sunlurio selects the fixture, optic, yoke and driver for the project. Before ordering, check the proposed model against the mounting drawing and the IES or LDT file for that optic.

Modular high power LED flood light for high mast lighting ports stadiums industrial yards and large area outdoor lighting projects
Modular flood light and aiming bracket.

Tell us what people need to see

Loading yards and gates

A uniform-looking yard can still have a dangerous gap where a truck reverses or a pedestrian steps off the curb. Mark vehicle routes, unloading points, pedestrian crossings and security gates separately on the site plan. Give each zone its own light target if the owner has provided one. If only an average is specified, ask whether there is a minimum at occupied points and a limit near adjoining buildings. When containers or parked trailers block the beam, identify their operating positions. A calculation made for an empty yard can miss the shadows the night team deals with every day.

Sports and public areas

Start with the activity and the viewing positions before comparing fixtures. A training court, a competition venue and a car park need different evaluation points. Mark sidelines and nearby homes as well as the playing area. Tell us whether vertical illuminance, glare or a curfew is part of the brief. Even when a wider beam reaches more of the ground, it can send light toward players looking upward or cause spill outside the property. Agree which limits the layout will be checked against so the review can resolve the real trade-off.

Industrial structures and perimeter

For a wall or structure mount, tell us the mounting height and how far the light must reach away from the wall. Mark conveyors, cranes, corrugated roofs and any moving structure that could change the aim or make the fitting hard to service. One port procurement review brought crane, yard and marine lighting into the same request. The useful lesson is to price and check these as separate lighting tasks. A crane working light needs its own mounting and vibration review, while the yard needs appropriate coverage at the ground points used by workers.

Compare beams by where the light lands

Reach, spread and edge control

Select candidate optics against the height, throw and aiming direction. A narrower beam may reach a distant task area. A wider distribution can fill the near area when the mounting position is low. Off-centre or asymmetric optics can help keep light on a long surface or inside a site boundary when a suitable optic is available. For each option, ask to see the minimum, average and the locations of the darkest points on the same calculation grid. A useful comparison also shows which fittings are aimed differently and why the angles are practical for the installer.

Start with the darkest working point

Ask your lighting reviewer to mark the worst relevant point and show how that point changes after an adjustment. If a column, stack or canopy blocks it, raising power across the whole yard can brighten the already bright areas and leave the obstruction in place. Moving a fitting, changing its aim or adding coverage from another direction may solve the actual problem. If you compare two proposals, use the same working plane, measuring area, obstructions and maintenance assumptions. Record both initial and maintained results if the project asks for them.

A port example from Tema, Ghana

At Tema Port, the container yard used 16 floodlights rated at 80 W on each 30 m mast. For your own yard, ask for a layout that shows how many fittings aim into each working zone and a service plan for the whole ring. A single fixture's wattage cannot explain the site's coverage. If you are changing only one group of lights, compare the darkest points and the ring load before and after the proposed change.

Port yard high mast lighting project at night
Mark the working zones and the point where the shift team needs more light.

Mark three things on the site plan

  • Show the darkest working point where people still need to see.
  • Mark containers, canopies or machines that cast shadows during use.
  • Show the mounting points and where each group of floodlights can be aimed.

Make the mechanical and electrical fit part of selection

Existing brackets and new supports

For a replacement, send a photo with a ruler, mounting hole centres, the bracket opening and clearance around the fitting. Flag whether the bracket must tilt, swivel or retain an existing stop. Ask for the overall fixture and bracket envelope, the weight and the projected area that your pole or steelwork designer needs. A bolt pattern alone does not show whether a longer body will hit a handrail or whether a bracket can hold the required aim. Access for tightening, adjustment and replacement should be planned while the bracket drawing is being approved.

Power, protection and control

Tell us the site voltage, frequency, switching method and any controls that must stay in place. Share available cabinet and circuit details with the electrical designer, especially on long runs and rows of fittings that switch together. Driver inrush, circuit grouping, cable length, voltage drop and surge protection should be checked together for the chosen equipment. Outdoor exposure also needs a project review. Identify salt, dust, vibration, washdown or high ambient temperature rather than giving only an enclosure rating. Ask which protection evidence applies to the supplied driver, fitting and mounting arrangement.

What to ask for before you approve the fixture

Freeze the optical version

Ask for one schedule that links the fixture code, input power, lumen output, colour temperature, optic, driver and bracket to the drawing and IES or LDT filename used in the design. A different lens or driver can change the outcome even when the housing looks identical. Check a readable label on the offered sample. We have seen an AC schedule paired with a photo of a solar light in a different power class. Checking the photo, model, input voltage and mounting drawing against the same line item catches that discrepancy before the drawing goes for approval. Treat a sample or a proposed substitution as a new item until the configuration and files have been checked. Use the IES and LDT guide to brief the team that will build or review the lighting model.

Agree the equipment boundary

The proposal should show the fittings and brackets by type and point to the approved listing of fixings. Ask the supplier and site contractor to sign off responsibility for poles, wall support steel, branch cables, cabinets, surge protection at the board, access equipment and installation. If drivers, optics or mounting hardware are needed as spares, name them separately and tie each one to its fixture code. For several work areas, ask for package marks that follow the area and optic schedule. That lets receiving staff send the right box to each crew without opening every carton.

Use one fixture record for design and delivery

Give each mounting position a code and carry the proposed fixture and optic through the lighting calculation, purchase schedule and receiving check.

Compare two fixtures at the same position

Keep height, target area, aiming and obstacles the same in both layouts. Record the exact model, optic and input watts for each proposal. Review the darkest working points and spill as well as the average lighting level.

Order the tested combination

Link the fixture code to the input power, measured light output, optic, driver, yoke and agreed hole pattern. Put the matching IES or LDT filename in the same equipment record. Review any proposed optic or bracket change before releasing the order.

Check the delivered sample

Compare the nameplate, bracket, mounting holes and optic identification with the agreed sample. Ask for the aiming mark or reference position used in the layout so the installer can reproduce it at the coded mounting point.

Use the sample to avoid expensive site changes

Check it at a real mounting point

For a retrofit, check one sample on a representative support where the crew can assess hole fit, adjustment and aiming. Compare the sample label with the technical schedule before lifting. Photograph the installed angle and tag the approved setting. If the sample uses different leads, optics or hardware, resolve the difference in writing before releasing the order. Make the installer and operator part of the check so the handover notes explain what can be adjusted and where the original aim must be kept.

Confirm delivery and handover

On arrival, reconcile the cartons, labels, driver and optic codes against the approved list, then record any damage before unloading progresses. On site, confirm mounting positions, aim, circuit labels and the test locations agreed with the owner. Measure under the specified conditions and record which fittings were on at the time. A calculation file is useful for planning, while measured results tell the team what was actually installed. Discuss access and safe isolation with the people who will service the fittings after handover. Our manufacturing and quality page shows the wider production and review process.

Give the installer an aiming schedule

Number the positions before delivery

Assign a short position code to each bracket on the lighting layout. The schedule should show the fixture code, optic, mounting height, orientation and aiming reference for that exact position. On a multi-light structure, provide a photograph or elevation indicating which bracket is which. If the replacement crew has to interpret angles from a coloured rendering alone, it is easy to install a left-facing optic on a right-hand position. Keep the final aiming record with the circuit and maintenance schedule. After a driver or fixture is replaced, the operator can restore the intended coverage instead of adjusting fittings by eye.

What is included in your project?

Fixture package

Agree the specific fixture, optic, driver, mounting yoke, input power and lead arrangement.

Quoted separately

Identify brackets or adaptors, drivers, optics, surge devices and spares that need separate lines.

Site work

Confirm steelwork, wiring, cabinets, earthing, access, installation and measurement responsibilities.

Each line should reference the same approved equipment list and drawing version.

Questions before choosing an AC flood light

Use wattage to check the electrical load alongside the driver information. Compare the existing and proposed photometry, mounting point, aiming and coverage before accepting the swap. Include any points where the owner has previously complained about shadows or glare. On a group replacement, identify whether the existing optics are identical at all positions.

Height helps narrow the shortlist. Add the actual distance to the target, the area width, the aiming direction and the allowed spill so the reviewer can compare optics under realistic conditions. Two mountings at the same height may need different beams when one lights a nearby gate and the other crosses a wide yard.

The photo is a useful start. Mark the dark area, show where the camera stood and include an approximate dimension so another person can interpret it. A daylight image of the support and an annotated site sketch usually make the next step clear. A photograph alone cannot establish illuminance or uniformity.

For an existing mast with a sound and approved mounting arrangement, review the luminaire and ring interface. If the project also needs a mast, foundation, lowering gear or a new ring, start with high mast lighting systems and agree the scope before selecting floodlights. Record the equipment loads for structural review.

Consider it where bringing a suitable mains circuit to the lighting point is impractical. Check the operating hours, battery reserve and solar panel exposure against the same light target. When grid power is available and the project needs long full-output hours, compare the AC path first. See the SL-FL solar flood light for that alternative.

Identify the fixture and optic schedule, supporting reports, relevant matching photometry, proposed mounting drawing, controls and scope split by line item. Note who is responsible for the design and the on-site checks. Give the reviewer a clear place to record substitutions and deviations so different versions cannot be mistaken for each other.

Yes, where the confirmed fixture series offers both. Put the beam code on each package and identify its location on the layout. At receiving, check that the quantities match each optic separately. If an installer interchanges near-field and far-field fittings, the total installed wattage stays the same while the site performance changes.