
All-in-One Solar Street Light
with Slide-Out Battery Access
Die-cast construction. Slide-out battery access. Keep the solar panel, light and energy system together, with a clearer route to battery access when maintenance is due.
A practical choice when service access matters.
SL-ONE-DR brings the solar panel, battery, charging controller and LED light into one assembly. It is a useful starting point for roads, entrances and public areas where there is suitable daylight and the integrated panel can remain clear of shade.
The slide-out battery compartment gives your maintenance team a defined way to reach the battery. We help you plan replacement access, compatible spare parts and servicing before you order, so you can compare the long-term cost as well as the purchase price.
Road projects
Start with road width, pole height and spacing. We help turn those conditions into a lighting configuration that can be assessed against the owner’s target.
Off-grid locations
Compare the solar option with the real cost of trenching, cabling and grid connection. The right answer depends on the site and the required night-time service.
Planned maintenance
Review battery access, replacement compatibility and spare parts before the order, so your maintenance team knows what it will need later.
Reach the battery without starting from scratch.

The battery compartment slides out from the end of the housing. The illustrated procedure starts by releasing the retaining screws, withdrawing the tray and releasing the battery restraint. Your team can reach the battery through the end compartment using the service procedure for the supplied version.
Before a replacement is dispatched, we check the battery dimensions, connector, voltage and controller compatibility against your supplied version. That small step helps avoid sending a battery that has the right capacity on paper but does not fit the tray.
Service access still needs to be planned around the installed pole, safe isolation and local working-at-height procedures. Ask for the service instructions with your order so the installer and maintenance team work from the same arrangement.
Plan my maintenance configuration ↗One housing. Clearly defined components.
Die-cast construction
The supplied design uses an ADC12 die-cast aluminium body, an aluminium LED board and optical lenses. The integrated panel sits above the housing, while the battery and MPPT controller are accommodated inside. The mounting adapter connects the assembly to the selected pole interface.
The LED source is 7070. The charging arrangement is MPPT across the range. When you compare alternatives, look at the complete assembly: housing, thermal path, battery, charging control and optics all affect the result.
Choose the operating arrangement
A motion sensor can be considered where the required operating profile allows it. For a road that needs continuous illumination, first agree the brightness schedule and then size the energy system around that schedule. We help you choose continuous lighting, timed dimming or motion response around how the road is used and the owner’s lighting target.
The product drawings explain the structure. For installation, we prepare the mounting and connection details to match the configuration being supplied.

For dimensions and mounting details, explore our datasheet and drawing support, or tell us which configuration you are considering.
Compare the energy system, not just the model size.
Five module sizes give you a starting range for a project discussion. Read the light output, panel and battery together: a higher light setting also changes the energy needed through the night.
Swipe the table to compare all specifications →
| Configuration | Reference power | Solar panel | Battery | Nominal energy | 7070 LEDs | L × W × H, mm | Pole interface, mm |
|---|---|---|---|---|---|---|---|
| 2 modules | 40 W | 50 W / 18 V | 12.8 V / 15 Ah | 192 Wh | 32 | 938 × 418 × 222 | 60 |
| 3 modules | 50 W | 70 W / 18 V | 12.8 V / 30 Ah | 384 Wh | 48 | 1068 × 418 × 222 | 60 |
| 4 modules | 60 W | 100 W / 18 V | 12.8 V / 45 Ah | 576 Wh | 64 | 1208 × 418 × 222 | 60 |
| 5 modules | 80 W | 120 W / 18 V | 12.8 V / 53 Ah | 678.4 Wh | 80 | 1393 × 488 × 222 | 80 |
| 6 modules | 100 W | 150 W / 18 V | 12.8 V / 67 Ah | 857.6 Wh | 96 | 1718 × 468 × 222 | 80 |
Common reference specification
7070 LED source · MPPT charging · 200 lm/W efficacy reference · 5500 K listed colour temperature · 80° × 150° listed optics · ADC12 die-cast aluminium housing.
New LiFePO₄ battery configuration · IP66 / IK08 as listed in the product specification. Ask us to match the relevant documents to your tender requirements.
Make the comparison useful
Use the table to shortlist a configuration; we then check the battery and panel against your required lighting hours. For your quotation we match the light setting, battery, panel and operating profile, and identify the corresponding photometric documents.




Tell us what the light must do through the night.
“Ten hours of lighting” can describe very different requirements. A light running at full output for ten hours needs a different energy allowance from one that starts brighter, dims later and responds to movement. We help you choose a pattern that keeps the road useful for the people who rely on it.
We also separate a normal night from the reserve required during poor charging weather. Your location, seasonal daylight, shading and the number of low-sun days influence the panel and battery selection. A larger battery cannot make up for a panel that is repeatedly shaded.
Four useful inputs
- Country and installation location.
- Hours of lighting and any permitted dimming.
- Whether motion response is acceptable.
- Required reserve during low-sun periods.
If these are not settled yet, tell us how the site is used. We can help you prepare questions for the owner.
Match my lighting hours ↗Judge the road by the light on it.
Brightness is only the beginning
The listed optic is 80° × 150°. To judge the result on your road, we also need installation height, spacing, road width and the arrangement of the poles. Those conditions determine where the light falls and whether people encounter dark gaps between lights.
We review the required illuminance and uniformity, including the less well-lit areas. Average lux alone can hide a dark section that matters to a driver or pedestrian.
Use the right calculation files
For projects needing a lighting calculation, we coordinate the model-matched IES file and a DIALux review against the proposed layout. The selected light setting should match the specification used for the quotation and sample.
Send the owner’s lighting requirement if you have it. If you do not, start with site photographs or a simple road sketch; we will help establish what needs to be checked.
Review my road lighting target ↗Explore IES / LDT photometric file support and DIALux lighting simulation support to see how we help you assess coverage, dark areas and uniformity.
Check the pole connection before ordering.

The reference range uses 60 mm interfaces on the smaller configurations and 80 mm on the larger configurations. For an existing pole, measure the actual connection and send a photograph. A nominal pipe description alone is not enough to establish the fit.
We check the adapter, fixing arrangement and access for tightening before agreeing the installation details. For a new pole, the complete assembly also needs to be considered for wind loading, foundation and earthing design.
Choose a position where the integrated panel has clear daylight. If the panel needs to face a different direction from the light, an All-in-Two light or Split system may be a more suitable starting point.
Know what your quotation includes.
A useful quotation lets your purchasing and site teams see the same package. We separate the integrated lighting unit from the civil works and additional items, so you can compare offers on a like-for-like basis.
Swipe the table to compare all specifications →
| Item | How we specify it for your order |
|---|---|
| Integrated lighting assembly | Selected body, solar panel, LED assembly, battery and MPPT controller, identified by configuration. |
| Mounting adapter and fixings | Matched to the agreed pole interface and confirmed in the supply list. |
| Pole, arm and anchor bolts | Separately itemised when included in the project package. |
| Foundation, installation and earthing | Coordinated with the project design and site responsibilities. |
| Sensor, control settings and spares | Listed as selected options or agreed spare parts, rather than assumed from a product picture. |
| Documents, warranty and packing | Matched to the selected configuration and stated in the written offer. |
Keep your quotation, sample and tender documents together.
A single configuration to evaluate
Project buyers often compare several price levels. We help keep each option identifiable, so a larger battery in one data sheet is not accidentally used to support a lower-cost configuration in another offer.
Your comparison should show the same power setting, battery energy, panel, operating profile, mounting arrangement and supply scope. That makes price differences easier to understand and gives the owner a clearer basis for approval.
Files that help you move forward
Tell us which documents your tender or consultant requires. We can help coordinate the configuration sheet, supply schedule, mounting information and the relevant lighting calculation inputs.
Where a tender needs a particular report or certificate, we check the applicable product and document before it is included. We check that the documents you submit identify the proposed model and configuration, helping the owner review a consistent package.
- Datasheets and installation drawing support →
- IES / LDT file support →
- DIALux lighting review support →
See our engineering support for help bringing your lighting layout, component configuration and project documents together. Include your document list in the enquiry so we can help you prepare the relevant package.
Approve the details before the production run.
Before production, agree the sample and the important components with us: battery, light assembly, controller, mounting interface and operating settings. Your approved sample becomes a practical reference for the order, not just a photograph of the housing.
If a component needs to change, we discuss it with you first. Where your project requires owner or consultant approval, that approval needs to be completed before the substitution proceeds.
For the drawer, review the actual battery access and restraint arrangement. We can walk your local team through battery removal and replacement, so they can plan the tools, access and spare parts before installation.
Arrange my DR sample review ↗Check together
- Configuration and battery identification.
- Light settings and expected duty profile.
- Pole connection and fasteners.
- Battery tray access and replacement procedure.
- Carton labels and order references.
Support the handover and the years after it.
Plan the spare parts before shipping
We discuss a practical spare-parts quantity with your team before dispatch. Batteries, controllers and other replacement items need clear identification so the local team can request the correct part later.
Agree packing labels, configuration references and the maintenance information with the order. They help the person receiving the shipment connect each carton to the approved product and its intended location.
Make later checks easier
A project does not end when the lights first turn on. Later maintenance, owner inspections and audits can affect acceptance and payment discussions. We help you keep the approved configuration, change records and handover information consistent, reducing avoidable questions when those checks arrive.
Warranty terms are agreed for the chosen configuration and project requirements. We set them out in the offer so you can review them with the owner before committing.
Prepare my project delivery package ↗Help your local team prepare
Tell us who will install and maintain the lights, what tools they have and how replacement parts will reach the site. We can then agree the spare-parts list, service information and packing references around the people who will do the work. Include the final delivery location when requesting transport, especially for a package with poles.
Find the solar street light arrangement that fits your site.
DR is designed for projects where integrated construction and battery access matter. If your road, solar-panel position or maintenance plan calls for a different arrangement, compare the options before choosing your configuration.
Compare All-in-One series
See how DR compares with our other integrated designs, and choose around your road, budget and maintenance needs.
Compare integrated seriesExplore All-in-Two lights
Consider a separate solar panel when its best position differs from the direction needed for road lighting.
Explore All-in-Two lightsExplore Split systems
Compare a separate-component arrangement when your site needs more flexibility in panel, battery and mounting layout.
Explore Split systemsNot sure which arrangement fits? Share a site photo, road dimensions or the owner’s requirement. We will help you shortlist the practical options.
Questions worth settling before you order.
Is the slide-out battery compartment tool-free?
No. The illustrated design uses retaining screws and a battery restraint. We provide the service arrangement for the supplied version so your maintenance team can plan the work safely.
Can I choose by wattage alone?
Use the reference power to start the discussion, then check the light distribution and night-time duty. Road dimensions, battery energy and charging conditions are needed to select a useful configuration.
Does an integrated light suit every pole location?
The panel needs usable daylight and the adapter must suit the pole. Trees, nearby buildings or an unsuitable orientation can make a separate-panel arrangement more practical.
Can you help if I only have site photographs?
Yes. Send the location, photographs and what you want to improve. We can help identify the road measurements and owner requirements needed for the next stage.
Can you supply poles and project documents as well?
We can discuss a package including poles, mounting items and the required project documents. Each item is identified in the supply schedule so your team knows what is included.
Keep a spare-battery record for each DR version
Use the supplied light and battery labels when ordering maintenance parts. Record one verified combination for each version the site will maintain.
Identify the installed light
Photograph the light and battery labels and note the number of modules and original order reference. Record the battery dimensions, voltage, connector and polarity. Ask for a part reference confirmed against that specific light and controller.
Order the parts the crew needs
List the compatible battery and any version-specific retention or sealing parts separately. If several DR configurations were delivered, label spares with the corresponding version so batteries and fittings are kept with the equipment they fit.
Check the reassembled sample
Have the crew use the approved service instructions for the supplied version. Record that the tray is seated and secured, the specified seal has been restored and charging and lighting operation were checked under the agreed handover procedure.
Let’s find the right configuration.
Tell us where the lights will be installed and what you want to improve. A short description is enough to start. If you have road dimensions, an owner’s specification or a site photograph, mention it and we will help you take the next step.
We can prepare a suitable configuration, clarify the supply scope and identify the technical documents your project needs.