Qatar 30m High Mast Lighting Project

Reference deployment delivered for EPC and tender workflows.
Includes typical configuration range and deliverables (IES / BOQ) with acceptance notes. 

Country / Area 🇶🇦 Qatar / Middle East
Client Type Engineering Contractor
Application Large Outdoor Parking Lot Lighting
Product System 30m Motorized Lifting High Mast Lighting System
Mast Height 30m
High Mast Type Motorized Raising and Lowering High Mast
Quantity 4 Complete Sets
Luminaire Configuration 10 × 600W LED Floodlights per Mast
Total Installed Power 6.0kW per Mast
System Efficacy ≥150 lm/W
Initial Luminous Flux ≥900,000 lm per Mast
Optical Distribution Mixed Wide, Medium and Asymmetric Long-Throw Optics
Lighting Target 10–15 lx Maintained Average Illuminance / Emin/Eavg ≥ 0.25
Light Quality 4000K / CRI ≥ 70
Protection IP66 / IK08–IK09 / 20kV Surge Protection
Electrical Performance PF ≥ 0.95 / THD ≤ 15%
Controls Photocell / Timer / Programmable Dimming
Preliminary Mast Spacing 95–115m
Final Verification DIALux / Relux Based on the Approved Site Layout
Year 2023

Project Background

Reference high mast lighting deployment in Qatar (2023) with 30m masts for large-area illumination. Drawings, layout notes, and typical acceptance checks can be aligned to EPC review scope on request.
Technical Configuration (Typical Range)
Large-area optics selection aligned to area size and target criteria (scope-based)
30 m mast height with luminaire arrangement defined by coverage and glare control needs
Wind load and foundation interface confirmed per site conditions and local requirements (on request)
Maintenance access and lowering/service method confirmed by selected mast system (scope-based)
Drawings and layout notes available for EPC review (on request)

Scope & Assumptions

A concise summary of what this reference covers and the verification inputs behind it.
Confirmed Project Scope
  • Project coverage: large outdoor parking lot lighting in Qatar
  • Project quantity: 4 complete 30m motorized lifting high mast lighting systems
  • Lighting configuration: 10 × 600W LED floodlights per mast, with 6.0kW total installed power
  • Performance target: 10–15 lx maintained average illuminance with Emin/Eavg ≥ 0.25
  • Verification approach: final mast arrangement, spacing, optics and aiming verified by DIALux or Relux using the approved site layout
Verification Inputs for Similar Parking Lot Projects
  • Mast configuration: 30m motorized lifting high mast with 10 × 600W LED floodlights per mast
  • Site layout: parking boundaries, access roads, obstructions and required dark-zone control must be identified
  • Lighting targets: 10–15 lx maintained average illuminance with Emin/Eavg ≥ 0.25
  • Optical arrangement: mixed wide, medium and asymmetric long-throw optics selected according to each coverage zone
  • Layout verification: preliminary mast spacing of 95–115m, with final positioning and aiming verified through DIALux or Relux using the approved site layout
Detailed verification inputs can be shared in a redacted pack or under NDA for tender review.

Photos & Acceptance Notes

Field photos confirm the deployment is real. The notes below summarize typical site acceptance checks used by EPC teams to reduce rework and sign-off risk.
High mast lighting yard project at dusk for large area illumination
Street lighting project reference image for Sunlurio case study
Recommended Installation & Acceptance Checks
✓ Mast & Lifting System
Verify mast verticality, base fastening, lifting operation, limit switches and safe raising and lowering of the luminaire assembly.
✓ Luminaire Arrangement & Aiming
Confirm all 10 × 600W floodlights are securely mounted and aimed according to the approved wide, medium and asymmetric optical layout.
✓ Wiring & Electrical Protection
Check cable terminations, phase connections, earthing, enclosure sealing, power factor, THD and 20kV surge-protection devices before commissioning.
✓ Photocell & Timer Control
Verify photocell switching, timer settings and the approved programmable dimming schedule under representative operating conditions.
✓ Nighttime Lighting Check
Review the parking area for aiming consistency, excessive glare, dark zones and overlap between adjacent high mast coverage areas.
✓ Illuminance & Uniformity Verification
Compare field measurements with the approved DIALux or Relux layout, targeting 10–15 lx maintained average illuminance and Emin/Eavg ≥ 0.25.
Final inspection points, measurement grids and acceptance records should follow the approved parking-lot layout and project requirements.

Deliverables Provided

Reference deliverables available for tender review and verification. Browse samples in the resource pages or request a project-ready pack.
Document support path for solar street lighting project review

IES / LDT Photometric Files

Browse IES files used for roadway optics verification and layout checks. Suitable for EPC submissions and audit trails.

BOQ and checklist support for solar street lighting project review

BOQ (Bill of Quantities)

Review BOQ examples aligned to scope, accessories, and configuration ranges for procurement and budgeting.

Lighting report and document review icon for engineering support

Drawings & Acceptance Checklist

Download or request CAD drawings, installation details, and datasheets for approvals.

Engineering document review support for solar street lighting project

DIALux / Relux Outputs

See report samples and typical verification items (maintained lux, uniformity, assumptions, and result tables).

FAQ (Tender & Verification)

Quick answers to common EPC / tender questions for this reference.
What documents can be shared for tender or EPC review?
Typical items include mast and foundation interface drawings (as required), luminaire arrangement notes, wiring/earthing notes, and acceptance checklist items. A verification pack can be aligned to the reviewer scope on request.
Do you provide layout notes or photometric verification for large-area lighting?
Yes. Layout notes can be provided for luminaire arrangement and aiming intent. If required by the reviewer, photometric verification inputs can be prepared based on the area boundary and target criteria.
What inputs are needed to size and verify a 30m high mast solution?
Area boundary (plan view), mounting height, target lux/uniformity (if specified), obstruction/shading notes, wind requirements, and maintenance access constraints. These inputs define the luminaire arrangement and aiming notes.
How do you handle wind load and foundation interface requirements?
Wind requirements and site constraints are confirmed per project brief. Foundation interface and anchoring details are provided according to the required scope (drawings and notes on request), and should be verified by the responsible engineer for the site.
Can you share photos and acceptance records under NDA?
Yes. Field photos and typical acceptance notes can be shared in a redacted pack. NDA can be used for traceability items (labels/IDs, configuration records, checklists) when requested by the client.

Get in Touch with Sunlurio Manufacturer

Send Your Project Information for Review

Sunlurio street light manufacturer replies within 24 hours with project-based technical support, technical suggestions and quotations for solar or LED street lighting projects.

Request a Project Document Pack

Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.