AC Street Light Project in India
Tender-ready reference for EPC review with documented assumptions and auditable deliverables.
IES/LDT photometry, layout outputs, and BOQ matching notes available as a redacted pack (or under NDA).
| Country / Region | 🇮🇳 India |
| Road Type | Main road sections |
| Client Type | EPC / contractor (tender workflow reference) |
| System Type | AC LED street lighting (section-based configuration) |
| Quantity | 420 sets |
| Pole Height | 7 m |
| Mounting | Single-side (staggered optional if uniformity requires) |
| Power Range | 60–90 W (80 W reference) |
| Optics | IES Type II / Type III (selected by road width) |
| Key Deliverables | IES/LDT + layout outputs + BOQ mapping notes |
Project Background
This India main road reference (7m poles, 420 sets) supports EPC tender workflows with documented assumptions and auditable deliverables.
IES/LDT photometry, layout outputs, and BOQ matching notes are provided to reduce clarification rounds and site rework.
Technical Configuration (Project Reference)
- ✓ Roadway optics: IES Type II / Type III options with IES/LDT files available for layout verification
- ✓ Mounting reference: 7m poles, single-side mounting; spacing documented per section and verified by outputs
- ✓ Luminaire range: 60–90W (80W reference) with CCT 4000K (3000K / 5000K optional), CRI ≥70
- ✓ Controls: dusk-to-dawn operation (photocell option documented; no smart CMS)
- ✓ Protection: IP66 / IK08 with surge protection 10kV standard (20kV optional) aligned to tender requirements
- ✓ Deliverables mapping: IES/LDT + layout outputs + BOQ matching notes, with installation & acceptance notes for EPC review
Scope & Assumptions
A concise summary of what this reference covers and the verification inputs behind it.
Scope (India Main Road)
- Coverage: main road sections (reference package for tender use)
- Use case: EPC / tender workflow requiring auditable assumptions
- Deliverables referenced: IES/LDT + layout outputs + BOQ matching notes
- Configuration approach: 7m pole package with section-based spacing and optics selection
Verification Inputs (Assumptions Documented)
- Pole height: 7m (fixed for this reference)
- Spacing: documented per section and verified by IES + layout outputs
- Optics: IES Type II / Type III selected by road width
- Targets: maintained lux & uniformity per project brief (simulation supported)
- Controls: dusk-to-dawn operation (no dimming / no smart CMS)
Detailed verification inputs can be shared in a redacted pack or under NDA for tender review.
Photos & Acceptance Notes
Field photos confirm the deployment is real. The notes below summarize typical site acceptance checks used by EPC teams to reduce rework and sign-off risk.
Acceptance Notes (Typical)
✓
Bracket / Arm Interface
Verified against drawings (spigot size, arm length, orientation).
✓
Wiring & Polarity
Checked before energizing; glands sealed and drip loop confirmed.
✓
Luminaire Orientation (Type II/III)
Aligned to roadway direction for consistent lateral coverage.
✓
Pole Verticality & Base
Checked after installation (base plate fasteners and alignment).
✓
Surge Protection & Grounding
SPD option confirmed; grounding point and continuity verified.
✓
Lux Spot-Check (Optional)
Performed on a representative section if required; recorded for review.
Tip: Full checklist and traceability notes can be shared in a redacted pack or under NDA for tender review.
Deliverables Provided
Reference deliverables available for tender review and verification. Browse samples in the resource pages or request a project-ready pack.

IES / LDT Photometric Files
Browse IES files used for roadway optics verification and layout checks. Suitable for EPC submissions and audit trails.

BOQ (Bill of Quantities)
Review BOQ examples aligned to scope, accessories, and configuration ranges for procurement and budgeting.

Drawings & Acceptance Checklist
Download or request CAD drawings, installation details, and datasheets for approvals.

DIALux / Relux Outputs
See report samples and typical verification items (maintained lux, uniformity, assumptions, and result tables).
FAQ (Tender & Verification)
Quick answers to common EPC / tender questions for this reference.
What documents can you provide for tender submission?
A tender-style redacted pack can include IES/LDT photometry, layout verification outputs, and BOQ matching notes.
Full deliverables and traceability notes can be shared under NDA if required.
Do you provide IES files and layout outputs for verification?
Yes. This reference is built around documented assumptions (7m poles, spacing per section, optics selection) and verification-ready outputs for EPC and consultant review.
How do you handle different road widths and spacing across sections?
We document section-based assumptions and select roadway optics (Type II / Type III) by road width.
Spacing is recorded per section and supported by IES + layout verification outputs for reviewer checks.
Does this project include smart control or dimming profiles?
This reference is configured for dusk-to-dawn operation without smart CMS or scheduled dimming.
If your tender requires dimming, motion sensors, or monitoring, we can provide an optional configuration range and documentation.
What inputs do you need to propose a similar package in 24 hours?
Road type, targets (maintained lux / uniformity), pole height, spacing/layout constraints, and your submission checklist.
If available, share a site sketch or CAD for faster alignment.
Get in Touch with Sunlurio Manufacturer
Feel free to ask any question to us
Sunlurio street light manufacturer replies within 24 hours with factory-direct support, technical suggestions and quotations for solar or LED street lighting projects.
- Linrui Business Plaza, Huangdao District, Qingdao,China
- 0532-83978013
- 0532-83978023
- 0086-18653218098
- info@sunlurio.com
- Mon - Fri: 9:00am - 6:00pm


