Factory & Manufacturing Capability
(Quality-Controlled Production)
Engineering grade manufacturing and quality system for EPC & government projects.
Backed by HiTech New Energy Group (factory authority)
Manufacturing and Quality Evidence
Review factory capability, inspection workflow, applicable test reports, packaging, and project documentation before final procurement decisions.
What should buyers confirm before quotation?
Manufacturing evidence should help buyers understand how project lighting products are produced, checked, packed, documented, and prepared for batch delivery.
Project country and city, application area, road width or site size, pole height, spacing, operating hours, backup-day target, control mode, environmental exposure, BOQ, drawings, and tender document requirements.
Model recommendation, datasheet, IES/LDT files where applicable, DIALux or Relux support when site data is complete, drawings, BOQ matching notes, packing information, and available certificates or test reports by model.
Confirm that requested certificates, power configuration, optical distribution, pole structure, battery autonomy, smart control protocol, delivery schedule, and acceptance method match the actual project scope.
Engineering files
Datasheets, IES/LDT, DIALux inputs, drawings, and BOQ notes are prepared by project requirement.
Manufacturing review
Factory process, inspection workflow, packaging, and batch delivery planning can be checked before procurement.
Compliance boundary
Certificates and test reports should be matched to exact model and tender requirement instead of assumed globally.
Documented QC
Incoming → in-process → final inspection, traceable records.
Reliability References
Battery safety, controller aging, waterproof/IP checks.
Tender-Ready Compliance
Certificates + UN38.3/MSDS pack available on request.
Audit Support
Due diligence files for EPC/government review.
Manufacturing Group Backing
Manufactured by HiTech New Energy Group with centralized factory management and documented quality system.
Production & Manufacturing System
- Controlled BOM and materials.
- Automated assembly lines.
- Advanced testing stations.
- Customized packaging.
- Scalable output capacity.
Quality Control Process (Traceable)
Incoming Inspection
- Component verification.
- Supplier audits.
- Material tests.
In-Process Control
- Functional testing.
- Aging & burn-in.
- Process monitoring.
Final Inspection
- Performance testing.
- Visual inspection.
- Packing validation.
Testing & Reliability References

Battery Safety

Controller Aging

Waterproof/IP

Charging Behavior

Pole & Coating Checks

Packing & Labeling

Photometric References (IES)

Surge & Lightning
Certifications & Compliance Documents
Tender-ready. Request stamped PDF pack within 24 hours.
Detailed test reports and certificates are available on request for government and EPC projects.
Factory Audit & Due Diligence Support
We support due diligence and factory audit preparation with an audit-ready file list and traceable records.
For group-level factory authority, refer to **HiTech New Energy Group
- Factory overview & manufacturing capability statement
- Quality control checkpoints summary
- Certifications list + verification info (where applicable)
- Packing standard & shipment evidence samples
- Project reference list (non-sensitive)
Packaging & Shipping Standard
Export-ready packing, container protection, and battery shipping compliance documents—available on request.
Export Packing Standard
Carton + foam protection, palletization options, and labeling rules.
Packing list and photo references are available for tender submission.
Container Loading Protection
Anti-scratch, anti-bend, and moisture protection for long-haul shipping.
Includes loading plan notes and reinforcement methods for mixed items.
Battery Shipping Compliance
UN38.3 test summary and MSDS pack for LiFePO₄ battery shipments.
Supports sea/air logistics and tender compliance checks.
Request M&Q / Certificates Pack (24H)
Share your country, quantity, product type, and tender requirements.
We will reply within 24 hours with a document list and the most relevant pack options.




