For project quotation, certificates should be matched with the exact product model, battery configuration, project country and tender requirement. CE, RoHS, ISO, SDS and UN38.3 documents may support different review stages, but they should not be used as a replacement for product datasheets, IES files, DIALux layout, BOQ matching notes or shipment documents.
Request available CE, RoHS, ISO or factory audit references for the selected product model and project stage.
For lithium battery projects, confirm SDS, UN38.3 test summary and packaging information before shipment planning.
Send tender clauses, BOQ items or consultant comments for document matching and technical clarification support.
Match datasheets, IES/LDT files, DIALux support, drawings and foundation references with the actual project inputs.
Country, city, road type, public area, port, parking lot or off-grid site condition.
Solar street light, LED street light, battery capacity, controller, pole height and mounting method.
BOQ item, tender clause, consultant comment, drawing or required compliance document list.
SDS, UN38.3 test summary, packaging and lithium battery transport requirements where applicable.
Datasheets, IES/LDT files, DIALux support, drawings, wiring references and BOQ notes can be prepared according to confirmed project inputs.
Factory process, inspection workflow, packaging method and batch delivery planning can be checked before procurement or shipment.
Certificates and test reports should be matched to exact model, battery configuration, supplier scope and tender requirement before submission.
Certificate and test report availability may vary by product model, component supplier, battery configuration, project country and tender stage. Please send the BOQ, product path or required document list before final submission.
Missing or incorrect certificates may lead to technical rejection during EPC or municipal tender evaluation.
Without UN38.3 or SDS, lithium battery shipments may be delayed or rejected by customs authorities.
Without IES or DIALux files, lighting design may fail to meet required illumination standards.
Incomplete documentation can delay project inspection and final acceptance by consultants or government authorities.
CE, ISO 9001 and product datasheets are commonly required for tender submission and technical compliance review.
IES / LDT files and DIALux simulations are used for lighting layout design, spacing calculation and illumination validation.
SDS and UN38.3 documents are required for lithium battery transportation approval and customs clearance procedures.
Inspection reports, compliance documents and installation records may be required during project handover and final acceptance.
engineering documentation support depends on confirmed model, battery configuration, destination country, site input and submission stage. Final availability of certificates, drawings, IES lighting design file data, DIALux simulation for street lighting, SDS battery safety document and UN38.3 lithium battery transport document should be checked before quotation or tender submission.
Sunlurio project lighting team usually replies within 24 working hours..
WhatsApp us
Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.