Factory & Manufacturing Quality Capability

Manufacturing, quality control, testing, certification, packing, and project document support for EPC, municipal, tender, and outdoor lighting procurement teams.
Factory Review
Inspection Workflow
Testing References
Certificate Support

Manufacturing & Quality Evidence

Before quotation or tender submission, buyers may need factory evidence, QC process references, testing documents, certificates, packing records, and shipment support. This page explains what Sunlurio can provide and what should be confirmed first.

Document List

Factory Review

Testing References

Certificate Pack

Engineering Files

Datasheets, wiring diagrams, packing lists, product drawings, and document packs can be prepared according to the confirmed product model and project scope.

Manufacturing Review

Factory photos, production process references, assembly records, and QC checkpoints help buyers review manufacturing capability before project confirmation.

Compliance Boundary

Available certificates, test references, and compliance files depend on product model, tender requirements, and the confirmed document stage.

What Should Buyers Confirm Before Quotation?

Manufacturing evidence and document support should match the actual product model, project scope, tender stage, and compliance requirement. Please confirm the following points before requesting files.

Product & Project Scope

Confirm the product type, quantity, project country, application area, installation condition, and delivery requirement before document preparation.

Required Document Stage

Clarify whether the documents are for quotation, consultant review, tender submission, customs clearance, or final handover.

Certificate & Testing Boundary

Confirm which certificates, test reports, packing files, or inspection references are mandatory for the project before assuming availability.

Note: Available files vary by product model, confirmed configuration, project scope, and document stage. Sunlurio does not recommend submitting generic certificates or test files without checking tender requirements.

Manufacturing Group Backing

Sunlurio coordinates product configuration, manufacturing evidence, quality review, packing references, and project document support through its manufacturing and supply chain resources.

Production & Manufacturing System

The production process should be reviewed by product type, project requirement, and document stage. The following workflow shows how manufacturing evidence is organized before delivery.

01

LED Module & Optics Preparation

Review LED modules, lens, optical distribution, housing, and product configuration according to the project application.

02

Driver / Controller / Wiring Assembly

Confirm driver, controller, wiring, protection components, and electrical matching before final assembly.

03

Battery, Solar Panel or Power Unit Matching

For solar or hybrid systems, check PV, battery, controller, and system configuration according to working hours and backup days.

04

Pole, Bracket and Housing Coordination

Coordinate pole, bracket, arm, housing, mounting method, surface treatment, and project drawings where applicable.

05

Final Inspection, Labeling and Packing

Prepare final inspection references, labels, packing photos, and shipment documents based on order and project requirements.
LED module optics and wiring assembly workshop for outdoor lighting manufacturing
Solar light controller and wiring units prepared for electrical matching review
Solar panel assembly workshop for solar street light production preparation
Battery power unit assembly and wiring check for solar lighting system matching
Lighting pole welding production for pole bracket and mounting structure coordination
LED street light packaging line with carton marks packing photos and shipment preparation
Production references may include LED module assembly, wiring, solar panel and battery matching, pole structure coordination, final inspection, labeling, and packing photos depending on the confirmed order stage.
After production is completed, each project order moves to our pre-shipment inspection workflow before packing and delivery.

Project Inspection Workflow Before Shipment

For project lighting orders, our inspection process covers not only the luminaire, but also the solar panel, battery, controller, pole, foundation components, wiring, packaging, and project documents before delivery.

PRE-SHIPMENT INSPECTION

Check the complete project system before delivery.

For solar street light and outdoor lighting projects, inspection must go beyond appearance and power-on testing. We review configuration, documents, materials, electrical performance, pole and foundation components, packing, and shipment documents before release.

Configuration consistency

Battery and solar panel matching

Pole, flange and foundation parts

Test records and packing evidence

01

Project Configuration Review

Check road width, pole height, pole distance, working hours, rainy days, installation country, and required lighting level before production.

02

Technical Document Matching

Review datasheet, IES file, DIALux report, BOQ, wiring diagram, pole drawing, and foundation drawing against the confirmed configuration.

03

Incoming Material Inspection

Check LED modules, optics, housing, battery cells, BMS, solar panel, controller, cables, pole steel, flange plate, and anchor bolts before assembly.

04

Battery & Solar Panel Verification

Verify battery voltage, capacity, BMS protection, solar panel power, Voc/Isc, and controller matching for the required autonomy.

05

Pole, Flange & Foundation Check

Check pole height, diameter, wall thickness, welding, galvanizing, flange size, anchor bolts, nuts, washers, and foundation cage dimensions.

06

Electrical & Lighting Performance Test

Test power, luminous output, CCT, CRI, dimming program, charging logic, discharging logic, and lighting control mode.

07

Aging Test & System Operation Check

Run aging tests to check LED stability, controller behavior, battery discharge, charging response, and system operation before packing.

08

Pre-shipment Packing & Document Check

Check quantity, labels, accessories, spare parts, installation kits, packing marks, inspection photos, test records, packing list, and shipment documents.

When required by the project or tender stage, related testing references and inspection records can be prepared for buyer review.

Testing & Reliability References

Inspection records and testing references can be prepared according to the confirmed project configuration, tender stage, and document requirements. These references help buyers review electrical safety, lighting performance, waterproofing, battery system behavior, packing condition, and shipment readiness before delivery.

Lighting Aging Test

Review LED stability, power-on performance, dimming behavior, and operating status during aging or burn-in testing.

Electrical Safety Test

Check insulation, grounding, wiring, short-circuit protection, controller connection, and basic electrical safety before shipment.

IP / Waterproof Reference

Review waterproof structure, sealing condition, cable entry protection, and outdoor enclosure reliability where applicable.

Battery / System Check

Check battery voltage, BMS protection, controller matching, charging logic, discharging logic, and system operation.

Pole & Coating Check

Review pole dimensions, welding condition, galvanizing or coating quality, flange plate, anchor bolts, and surface treatment.

Packing & Labeling

Check product labels, carton marks, accessory list, spare parts, packing quantity, and project shipment references.

Photometric Reference

Provide IES / LDT files, DIALux or Relux support, and lighting simulation references according to the project stage.

Surge & Lightning Protection

Review SPD configuration, grounding requirement, controller protection, and lightning-prone project conditions where applicable.

Lighting product testing and quality control checkpoint before shipment
Aging test reference
Battery BMS and power unit check for solar lighting system matching
Battery system check
Lighting pole bracket flange and housing coordination for project orders
Pole and coating review
Lighting product testing and quality control checkpoint before shipment
Photometric reference
After testing references are reviewed, labels and packing records help connect the delivered goods with the confirmed project configuration.

Labels & Traceability

Project orders require clear product labels, carton marks, batch references, packing photos, and shipment documents. Traceability helps buyers connect delivered goods with the confirmed configuration, BOQ, packing list, and project handover records.

Product Label

Review product model, wattage, system configuration, batch reference, and basic identification information before shipment.

Carton & Pallet Marks

Check carton marks, pallet labels, quantity references, accessory notes, and project shipment identification.

Project Traceability

Connect packing photos, inspection records, packing list, shipment documents, and project configuration for buyer review.

LED street light packaging line with carton marks packing photos and shipment preparation
Packing labels and documents
Carton pallet packing reference with protective wrapping for project lighting shipment
Carton packing reference
Finished solar lighting products arranged for warehouse checking before shipment
Shipment traceability

Certificates & Compliance Documents

Available documents depend on the confirmed product type, project configuration, shipment requirement, and document stage. Please confirm the required certificate list before quotation, tender submission, customization, shipment clearance, or project handover.
RoHS compliance document reference for applicable lighting product configuration

Product Compliance Reference

Review available compliance documents for the confirmed product model, application, and project requirement.
CQC certification reference for Sunlurio lighting quality review

Lighting Product Certificate

Certificates for lighting products can be reviewed according to the selected luminaire, electrical specification, and market requirement.
UN38.3 lithium battery transport document for shipment approval review

Battery / Shipment Document

For solar lighting systems with batteries, shipment documents such as UN38.3 / MSDS can be checked where applicable.
ISO 9001 quality management reference document for Sunlurio project review

Factory / Quality System File

Factory and quality system references can support buyer review, supplier qualification, and early-stage project due diligence.
Lighting product testing and quality control checkpoint before shipment

Testing Report Reference

Testing references may include aging, electrical safety, photometric, waterproofing, or shipment-related inspection records according to project stage.
Tender document support pack for EPC lighting project documentation review

Tender Document Support

Datasheets, drawings, IES / LDT, DIALux / Relux support, BOQ notes, and technical deviation notes can be prepared when required by the tender stage.
Document availability depends on confirmed product type, project configuration, shipment requirement, and document stage.

Factory Audit & Due Diligence Support

For project-based procurement, buyers may request manufacturing photos, process references, QC checkpoints, packing records, and shipment evidence to support supplier review before order confirmation or delivery.
BUYER REVIEW SUPPORT

What buyers can review before shipment

For project lighting orders, available review materials can help buyers understand manufacturing readiness, inspection status, packing preparation, and shipment evidence before delivery.
  • Factory photos and production process references
  • QC checkpoints and testing reference files
  • Certificate and document availability
  • Packing, labeling, loading, and shipment evidence
  • Project configuration and document matching records
Factory aerial view showing rooftop solar workshops and outdoor lighting production areas
Lighting pole workshop fabrication reference for high mast manufacturing review
LED street light final assembly line with luminaires prepared for project orders
Carton pallet packing reference with protective wrapping for project lighting shipment

Packaging & Shipping Standard

For project lighting orders, packaging and shipment references help buyers review carton marks, pallet condition, accessory lists, spare parts, battery shipment documents where applicable, packing photos, loading records, and project delivery documents before dispatch.
Carton pallet packing reference with protective wrapping for project lighting shipment

Box / Pallet Packing Standard

Review carton packing, pallet protection, product separation, accessory placement, and packing photos before shipment.
Container loading reference for outdoor lighting shipment preparation

Container Loading Reference

Check loading photos, container condition, loading sequence, packing stability, and shipment preparation records where available.
LED street light packaging line with carton marks packing photos and shipment preparation

Shipment Labeling Compliance

Review carton marks, lithium battery labels where applicable, packing list, commercial invoice support, and shipment document matching.
Shipment documents depend on product type, battery configuration where applicable, shipment route, and buyer document requirements.

Related Engineering Resources

Explore related product pages, engineering support, project references, and document resources for project lighting procurement or tender preparation.

Request Manufacturing & Quality Evidence Pack

Share your project type, document purpose, and required evidence. Our team will review your request and reply with the suitable document list according to the confirmed product configuration and project stage.

Request a Project Document Pack

Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.