Tender Documents & BOQ Review for Lighting Projects

Upload your available BOQ, tender specification, lighting layout, or required-document list. Sunlurio can conduct a preliminary review to identify missing inputs, flag compliance or technical-deviation points, confirm the proposed product scope, and map an appropriate document path.

This is a preliminary supplier-side review. Final tender interpretation, acceptance, and approval remain with the buyer, consultant, project engineer, or relevant tender authority.

Scope note: Document availability depends on the confirmed scope, product configuration, tender requirements, and document stage.

Street lighting BOQ markup desk for tender document review
TENDER REVIEW PATH

A Controlled Path from Tender Inputs to Document Direction

The review starts with the files you already have. Missing information is listed before any product or document path is treated as confirmed.

STEP 1

1 — Upload BOQ / Specification

Send the available BOQ, technical specification, drawings or layout, required-document list, and tender deadline.
Review output: received-file summary and initial review scope.

STEP 2

2 — Identify Missing Inputs

Check project data affecting configuration and document matching, including location, geometry, pole height, spacing, lighting target, operating schedule, power, wind, and standards.
Review output: clarification list.

STEP 3

3 — Review Compliance Gaps

Compare requested clauses and evidence with available product information and document status.
Review output: compliance-gap and confirmation notes.

STEP 4

4 — Confirm Product Scope

Review the proposed product family, configuration, quantities, optics, pole interfaces, controls, and accessories against the BOQ.
Review output: preliminary scope direction.

STEP 5

5 — Prepare / Map BOQ Matching

Map BOQ lines to proposed product descriptions, model direction, key parameters, and permitted alternatives or deviations.
Review output: BOQ matching notes.

STEP 6

6 — Map Required Documents

Group datasheets, photometric files, simulations, drawings, compliance evidence, installation, packing, inspection, and handover files by purpose and availability.
Review output: document map.

STEP 7

7 — Release the Appropriate Document Path

Provide suitable available materials, request remaining inputs, or route the request to product, photometric, drawing, or engineering review.
Review output: document path or clarification list—not tender approval.

Built for Project and Tender Teams

For EPC, public-sector, humanitarian, consultant, and tender-driven teams coordinating product scope, technical review, and document requirements.

EPC Contractors

For teams coordinating BOQ lines, product scope, drawings, technical submissions, installation requirements, and handover documents across work packages.

Government / Municipality

For public-lighting procurement teams reviewing technical clauses, maintenance needs, acceptance requirements, and supplier document scope.

UN / NGO

For humanitarian and development-project teams needing a clear product, delivery, installation, inspection, and handover document path.

Engineering Consultants

For consultants checking lighting inputs, photometric matching, technical deviations, pole or foundation interfaces, and evidence required for project review.

Tender-Driven Buyers

For procurement teams, distributors, local agents, and project owners working from a tender specification or required-document list before quotation or submission.

Send What Is Available

A complete tender package is helpful, but it is not required to begin a preliminary review. Send the available files and identify what is still pending.

Buyer and Project Context

Company name, buyer role, project country and city, application, procurement stage, and intended submission or review purpose.

BOQ and Tender Specification

BOQ lines, technical clauses, material requirements, permitted alternatives, applicable standards, requested evidence, and accepted file formats.

Lighting Layout and Geometry

Road width or area dimensions, pole positions, mounting height, spacing, carriageway arrangement, and available CAD or PDF drawings.

Performance and Operating Requirements

Target illuminance and uniformity, operating hours, dimming, solar backup days, AC power conditions, and control requirements.

Structure and Site Conditions

Wind speed, corrosion environment, pole material, flange, anchor-bolt and foundation expectations, civil information, and installation constraints.

Document Requirements and Priority

Required datasheets, photometric files, reports, drawings, compliance evidence, packing, installation, inspection, acceptance and handover files, plus tender deadline and priority.

Important: Do not delay the first contact because one input is missing. The preliminary review can identify the next clarification items.

Gaps That Can Change Product or Document Matching

These common gaps can change the proposed configuration, quotation basis, or document path and should be clarified before tender use.

Most Common BOQ Gap

Unclear Product Scope

The BOQ may not distinguish solar or AC street lights, smart lighting, high mast systems, poles, floodlights, controls, accessories, or civil works.

Geometry or Quantity Conflict

Road width, area dimensions, pole height, spacing, mounting arrangement, or quantities may be missing or inconsistent.

Lighting Target Not Defined

Target illuminance, uniformity, road class, calculation grid, maintenance assumptions, or acceptance method may be unclear.

Solar Operating Conditions Missing

Country and city, working hours, dimming, backup days, seasonal solar conditions, or sizing assumptions may be absent.

Photometric File Mismatch

IES or LDT evidence must match the proposed model, wattage, optics, and mounting conditions; a generic file is not model-matched evidence.

Pole / Foundation Inputs Missing

Pole height, material, arm, flange, anchor bolts, wind speed, corrosion category, and site conditions affect drawing and foundation review.

Map Documents by Tender Purpose

No single pack is assumed to cover every tender. Documents are mapped to the confirmed product scope, requirements, intended use, and document stage.

Product and BOQ Files

Matched datasheets, product descriptions, preliminary model direction, BOQ matching notes, and a compliance or deviation matrix where applicable.

Photometric and Lighting-Design Files

Model-matched IES/LDT files, DIALux/Relux input review, confirmed project simulations, layouts, and calculation assumptions.

Drawings and System References

Product, pole, arm, flange and anchor-bolt drawings; foundation review path; wiring and smart-control architecture where applicable.

Compliance and Quality Files

Applicable certificates or reports matched to scope, suitable inspection or quality records, and technical clarification records.

Delivery, Installation, and Handover Files

Packing references, installation and wiring guidance, inspection and acceptance checklists, and commissioning or handover direction.

Availability boundary: The final document list depends on confirmed product scope, tender requirements, intended use, and document stage.

Controlled Access Based on Project and Document Stage

Release depends on intended use, confirmed project context, product scope, configuration, tender requirement, and document stage.

Public Sample

Level 1 — Public Preparation Materials

General checklists, input sheets, sample file structures, and non-project-specific guidance may be available for early tender preparation.
Release condition: public and suitable for general use.

After Basic Project Info

Level 2 — After Basic Project Information

Selected or redacted preparation materials may be shared after the buyer role, project context, intended use, and document purpose are clear.
Release condition: legitimate purpose confirmed.

After Tender / Engineering Review

Level 3 — After Tender / Engineering Review

Model-matched files, project-specific outputs, BOQ matrices, deviations, drawings, compliance evidence, and full document paths require scope and configuration review.
Release condition: confirmed scope, requirement, and stage.

Document access is controlled by scope and stage. Submission does not guarantee release of every requested file.

Compare the Requirement, Proposed Scope, Evidence, and Remaining Decision

A supplier-side review records each tender requirement, proposed product scope, supporting evidence or deviation, and the confirmation still required.

Tender Requirement

Record the exact BOQ line, clause, standard, performance target, or document requirement being reviewed.

Proposed Product Scope

State the proposed family and configuration, including relevant model, optical, structural, control, component, or accessory assumptions.

Supporting Evidence or Deviation

Map the available datasheet, drawing, report, certificate, photometric file, simulation, or clarification note; describe any deviation without implying acceptance.

Required Confirmation

Identify what still requires buyer, consultant, local engineer, laboratory, certification body, or tender-authority confirmation.

Requirement vs proposed scope: deviation notes should compare the tender requirement, proposed configuration, supporting document and confirmation still required. This is a review aid, not a substitute for consultant approval.

Prepare the Inputs That Control the Review

Use this checklist to organize the available project, BOQ, lighting, structural, site, delivery, and handover inputs before submission.

Project: company, buyer role, location, application, stage, and deadline.

BOQ / Specification: BOQ, clauses, standards, alternatives, evidence, required documents, and formats.

Lighting / Product: layout, dimensions, pole height, spacing, quantity, targets, optics, operating schedule, power, solar backup, and controls.

Structure / Site: wind, corrosion, pole, foundation, civil, electrical, and installation interfaces.

Delivery / Handover: packing, inspection, installation, commissioning, acceptance, and priority documents.

Tender and BOQ Review FAQ

Scope, evidence, access, timing, and approval boundaries for preliminary supplier-side tender support.

Yes. Sunlurio can review available BOQ, tender specifications, project information and document requirements, then reply with missing inputs and a suitable document direction.
Please send the BOQ, tender specification, project location, product path, quantity, lighting layout, road or area dimensions, required documents and deadline if available.
BOQ matching notes can be prepared after product scope, model direction, document requirements and tender stage are reviewed.
Yes, where applicable. A technical deviation sheet compares tender requirements with the proposed product scope and document availability, but it does not replace final consultant or local project engineer approval.
DIALux / Relux support and IES / LDT files depend on confirmed product model, optical distribution, layout, target lux, mounting height and project conditions.
Product drawings, pole drawings and foundation references depend on product configuration, pole height, wind speed, flange, anchor bolts, site conditions and project scope.
No. Public samples may be shared early, but actual product files, project-specific DIALux reports, BOQ compliance matrices, drawings, wiring diagrams, certificates and full document packs require confirmed scope and configuration.
Please submit the available documents and deadline through the Project RFQ form. Sunlurio will review whether a document direction or clarification list can be prepared based on available inputs.

Submit Your BOQ for a Preliminary Review

Send the available BOQ, tender specification, drawings or layout, required-document list, and deadline. Sunlurio will identify the suitable next document path or remaining clarification items.

Review boundary: Preliminary supplier-side review only. Final tender interpretation, compliance acceptance, and approval remain with the relevant buyer, consultant, project engineer, or tender authority. Document availability depends on confirmed scope, configuration, tender requirements, and document stage.

Request a Project Document Pack

Share your project location, road width, pole height, spacing, working hours, backup days, and required documents. Our team can help prepare configuration guidance, datasheets, IES/LDT files, DIALux support when applicable, drawings, and BOQ matching notes.